Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 20, 2026 at 8:00 PM
Updated March 21, 2026
Site work and new construction of a municipal facility in Bourne, Massachusetts. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.
The participation goals for this project shall be 15.3% for minorities and 6.9% for women. Question Deadline 02/13/2026 at 2:00 PM ET All bidding Requests for Information (RFIs) shall be submitted online by for filed sub-bids. The work is estimated to cost $17,000,000.00. The Project consists of but not limited to Construction of a new 25,000 SF Office and Garage Maintenance facility and associated utilities, site work, and paving. The new facility will be located adjacent to the existing landfill operations. The existing landfill site will remain fully operational during the construction. All landfill operations will remain in the existing buildings until the new structure is complete. Sub Bid Category Masonry, Miscellaneous Metals, Waterproofing/Dampproofing, Roofing, Glass & Glazing, Tile, Acoustical Tile, Painting, Fire Protection, Plumbing, HVAC, Electrical Estimated Cost $17,000,000 Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. PRE-QUALIFIED TRADES: Masonry, Misc. Metal, Waterproofing, Roofing, Glass, Tile, Acoustical Tile, Painting, Fire Protection, Plumbing, HVAC and Electrical. Bid Result Masonry - G. V. W. Inc - $440,000 Miscellaneous And Ornamental Metals - South Shore Welding, Inc. - $241,075 Waterproofing/Dam proofing/Caulking - Acme Waterproofing co Inc - $101,250 Roofing and Flashing - Greenwood Industries, LLC - $1,427,000 Glass And Glazing - Lizotte Glass - $75,200 Tile - Joseph Cohn & Son Tile & Terrazzo, LLC - $64,999 Acoustical Tile - M.L. McDonald - $54,900 Painting - Top Quality Painting - $161,900 Fire Protection Sprinkler - Carlysle Engineering - $249,100 Plumbing - Schindler Plumbing Heating - $472,000 HVAC - Araujo Bros Plumbing & Heating - $1,113,000 Electrical Work - Mak Electric - $1,420,000
Award
Municipal
$15,989,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2026
April 20, 2026
201 MacArthur Blvd, Bourne, MA
Related To This Project
Bourne, MA
Bid Date: Mar 12 2026
Bourne, MA
Bid Date: Sep 16 2025
Bourne, MA
Bid Date: Sep 05 2025
Bourne, MA
Bid Date: Sep 22 2025
Bourne, MA
Bid Date: Dec 02 2020
Bourne, MA
Bid Date: Jun 18 2019
Bourne, MA
Bid Date: Sep 22 2025
Bourne, MA
--
Bourne, MA
Bid Date: Aug 21 2025
Bourne, MA
Bid Date: Sep 17 2025
Bourne, MA
Bid Date: Aug 28 2025
Bourne, MA
Bid Date: Mar 18 2026
Bourne, MA
Bid Date: Jan 22 2026
Bourne, MA
Bid Date: Aug 27 2025
Bourne, MA
Bid Date: Sep 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
