Published September 15, 2025 at 8:00 PM

Updated September 18, 2025

Site work for a water / sewer project in Bourne, Massachusetts. Completed plans call for site work for a water / sewer project.

Cleaning Beach Well and Church Lane Well. The Work consists of removal, inspection and reinstallation of the well pump; inspecting and videoing the well; cleaning and redevelopment of the well; motor testing; and pump testing for the Beach Well and Church Lane Well. The Beach Well is a 52 feet deep, 24-inch diameter gravel packed well with 18-inch diameter liner screen and casing and design pumping rate of 500 gpm. The Church Lane Well is a 190 feet deep, 16-inch diameter gravel packed well with design pumping rate of 700 gpm. Estimated Cost $50,000 Project Location: Beach Well 41 Pilgrim Road, Bourne, MA. Church Lane Well 90 Church Lane, Bourne, MA. To receive consideration, such questions shall be submitted in writing to Engineer at least three (3) business days before the established date for receipt of Bids Questions shall be submitted in writing to kberger@resilientce.com. The Work of the Project is defined by the Contract Documents and consists of the following: 1. Removal, inspection and reinstallation of the well pumps; inspecting and videoing the wells; cleaning and redevelopment of the wells; and pump testing. a. Beach Well (1) This well is a 52 feet deep, 24-inch diameter gravel packed well with 18-inch diameter liner screen and casing and design pumping rate of 500 gpm. (2) The well was installed in 1958. (3) The well pump was last tested in 2024. Refer to the Attachments for the Pump Test Report. (4) Work to be completed on the Beach Well, 41 Pilgrim Road, Bourne, MA. b. Church Lane Well (1) This well is a 190 feet deep, 16-inch diameter gravel packed well with design pumping rate of 700 gpm. (2) The well was installed in 2002. (3) The well pump was last tested in 2024. Refer to the Attachments for the Pump Test Report. (4) Work to be completed on the Church Lane Well, 90 Church Lane, Bourne, MA. 2. The wells may only be off-line one at a time. The first well to be cleaned (Church Lane Well) must be fully back in service prior to taking the second well (Beach Well) off-line.

Post-Bid

Water / Sewer

$50,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
444
Active Projects
212
Bidding Soon
2,972
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

October 15, 2025

Project location map

Multiple Locations, Bourne, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.