BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Renovation of a municipal facility in New Iberia, Louisiana. Completed plans call for the renovation of a municipal facility.

One Block at a Time - Exterior House Painting. Each bid must be accompanied by a bid security (certified check, cashier's check or bid bond with power of attorney for an amount equal to 5% of the total bid. Money orders and/ or company checks will not be acceptable. Such security will be no less than 5% of the net amount bid, excluding taxes. Once the NOTICE TO PROCEED is issued, the project must be substantially completed in 100 calendar days. Rain delay days will be accepted. Liquidated damages are $100.00 per calendar day. The City of New Iberia reserves the right to reject any and all bids for just cause in accordance with the Public Bid Law LA R.S. 382214.B. If there are any questions regarding bidding procedures, contact Paul J. Allain, Architect APAC located at 109 N. Weeks Street, New Iberia, LA 70560; 337-365-9493; or PJAllain@aol.com. If there are any questions regarding bidding procedures, contact Paul J. Allain, Architect APAC located at 109 N. Weeks Street, New Iberia, LA 70560; 337-365-9493; or PJAllain@aol.com. Doc Notes: On other sets of documents furnished to bidders, the deposit less the actual cost of reproduction, shall be refunded upon return of the documents no later than ten days after receipt of bids. No hard copy sets of contract documents will be provided for bidding and/or construction. Official Bid Documents are available at online. SCRIPTION A. Work included: To assure adequate planning and execution of the Work so that the Work is completed within the number of calendar days allowed in the Contract, and to assist the Architect in appraising the reasonableness of the proposed schedule and in evaluating progress of the Work, prepare and maintain the schedules and reports described in the Section. B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications. 2. Requirements for progress schedule: General Conditions. 3. Construction period: Form of Agreement.

Award

Municipal

$141,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

33

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
0
Bidding Soon
190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

October 3, 2025

Project location map

To Be Determined, New Iberia, LA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.