Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 1, 2025 at 8:00 PM
Updated October 2, 2025
Renovation of a municipal facility in New Iberia, Louisiana. Completed plans call for the renovation of a municipal facility.
One Block at a Time - Exterior House Painting. Each bid must be accompanied by a bid security (certified check, cashier's check or bid bond with power of attorney for an amount equal to 5% of the total bid. Money orders and/ or company checks will not be acceptable. Such security will be no less than 5% of the net amount bid, excluding taxes. Once the NOTICE TO PROCEED is issued, the project must be substantially completed in 100 calendar days. Rain delay days will be accepted. Liquidated damages are $100.00 per calendar day. The City of New Iberia reserves the right to reject any and all bids for just cause in accordance with the Public Bid Law LA R.S. 382214.B. If there are any questions regarding bidding procedures, contact Paul J. Allain, Architect APAC located at 109 N. Weeks Street, New Iberia, LA 70560; 337-365-9493; or PJAllain@aol.com. If there are any questions regarding bidding procedures, contact Paul J. Allain, Architect APAC located at 109 N. Weeks Street, New Iberia, LA 70560; 337-365-9493; or PJAllain@aol.com. Doc Notes: On other sets of documents furnished to bidders, the deposit less the actual cost of reproduction, shall be refunded upon return of the documents no later than ten days after receipt of bids. No hard copy sets of contract documents will be provided for bidding and/or construction. Official Bid Documents are available at online. SCRIPTION A. Work included: To assure adequate planning and execution of the Work so that the Work is completed within the number of calendar days allowed in the Contract, and to assist the Architect in appraising the reasonableness of the proposed schedule and in evaluating progress of the Work, prepare and maintain the schedules and reports described in the Section. B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications. 2. Requirements for progress schedule: General Conditions. 3. Construction period: Form of Agreement.
Award
Municipal
$141,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
33
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2025
October 3, 2025
To Be Determined, New Iberia, LA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
