BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2025 at 8:00 PM

Updated September 19, 2025

Site work for a service station / car wash facility in Cedar Rapids, Iowa. Completed plans call for site work for a service station / car wash facility.

Installation of Electrical Service for EV Charging Stations as requested by the City of Cedar Rapids Facilities Maintenance Services Division . Bids may be withdrawn any time prior to the scheduled closing time for receipt of bids; no bid may be modified or withdrawn for a period of sixty (60) calendar days thereafter. Pre Bid Notes : Bids from companies who do not attend Background - The City of Cedar Rapids is seeking bids from qualified Contractors for the installation of Electrical Service for EV Charging Stations as requested by the Facilities Maintenance Service Division. 2.0 Scope of Work 2.1 Contractor shall verify site conditions, as well as charging station items provided by City. City will provide 6 dual chargers, for a total of 12 level-2 vehicle chargers. Specifications for the charging stations is provided in the attachment section. 2.2 Contractor shall install a dedicated electrical panel to meet the necessary requirements for 600-amp, single phase 120/240v service. 2.3 A MANDATORY pre-bid meeting is being held on Wednesday, August 20, 2025 at 3:00pm at the City Services Center, Five Seasons Conference Room, 500 15 th Avenue SW, Cedar Rapids, IA 52404. Bids from companies who do not attend the mandatory pre-bid meeting will be deemed non-responsive. 2.4 Contractorshall work with Alliant Energy to prove a new service and new service requirements to the East side of the building. 2.5 Contractor shall provide a self-enclosed meter socket, panel board and wiring to provided EV chargers. 2.6 Contractor shall schedule and coordinate the final inspection with City staff to ensure the work meets safety and code compliance. 2.7 Contractor shall provide testing and commissioning of units once the installation is complete. Contractor shall test the system to ensure proper functionality, including checking for optimal charging performance and safety checks in accordance with manufacturer specifications. 2.8 Contractor shall provide training and equipment demonstration of how to use the EV charger(s) to City staff. the mandatory pre-bid meeting will be deemed non-responsive. Question Deadline 08/21/2025 at 11:00 AM CT

Award

Service Station / Car Wash

$28,300.00

Public - City

Site Work

4

9

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
90
Bidding Soon
1,104
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

September 26, 2025

Project location map

2604 16th Ave SW, Cedar Rapids, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.