BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work and paving for a road / highway in Sturgeon, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

North Ruby Street & E. Burks Street Pavement Improvement Project Project Scope: The City of Sturgeon is requesting bids for asphalt rut fill and overlay work to improve the condition of designated roadway segments. This project will involve applying approximately 0.05 inches of rut fill followed by a 2-inch asphalt overlay on specified street segments. Project Locations & Dimensions: 1. North Ruby Street From: Francis Street To: Proctor Street Length: Approximately 620 feet Width: Approximately 20 feet Area: 13,000 sq. ft. Work: 0.05" rut fill + 2" asphalt overlay 2. East Burks Street (Segment A) From: Ogden Street To: South Rocheford Street Length: Approximately 780 feet Width: Approximately 20 feet Area: 15,600 sq. ft. Work: 0.05" rut fill + 2" asphalt overlay 3. East Burks Street (Segment B) From: East side of bridge To: City Limits Length: Approximately 300 feet Width: Approximately 20 feet Area: 6,000 sq. ft. Work: 0.05" rut fill + 2" asphalt overlay Total Estimated Area: 34,600 sq. ft. 3,840 square yards) Bid Specifications: A. Materials and Methods: Rut Fill: Apply 0.05 inches of asphalt leveling course to correct wheel path depressions. Overlay: Apply 2-inch compacted thickness of hot mix asphalt (HMA) over the prepared surface. Surface Preparation: Clean existing pavement and apply tack coat before rut fill and overlay. Compaction: Minimum of 92% of maximum theoretical density (AASHTO T209). Traffic Control: Contractor is responsible for signage, flagging, and safe traffic flow around the work zone. B. General Requirements: Contractor must be fully licensed and insured. All work must comply with Missouri Department of Transportation (MoDOT) standards. Contractor is responsible for coordinating with utility providers if conflicts arise. All debris and excess material must be removed from the site upon completion. Pavement transitions must be smoothed and feathered at all endpoints. C. Bid Deliverables: Lump sum and unit price bid for each segment Estimated start and completion timeline Warranty information (minimum 1 year preferred) References for three similar projects completed in the last 3 years Example The City reserves the right to reject any or all bids and award the project in the best interest of the City.

Bid Results

Roads / Highways

$62,280.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
32
Bidding Soon
454
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

September 24, 2025

Project location map

E Burks St & S Ruby St, Sturgeon, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.