BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated October 4, 2025

Site work and paving for a mixed-use development in Cypress, California. Working plans call for site work for a sidewalk / parking lot; road / highway; for paving for a road / highway; and sidewalk / parking lot.

“The owner has determined a prequalified list of design build companies."' The project site is located on Valley View Street from Artesia Boulevard (north City Limits) to Lincoln Avenue (South City Limits). The project spans approximately 2.85 miles and will involve various improvements, including, but not limited to, asphalt pavement rehabilitation (section to be determined); the removal and replacement of damaged curb and gutter, cross gutters, sidewalks, and ADA ramps (if not compliant with current ADA standards); driveway approaches; signing & striping; utility adjustments; traffic control; and other incidentals as necessary to complete the project in its entirety. Question Deadline 08/21/2025 at 3:00 PM PT Online Q&A Yes Prior to the RFP submission deadline, questions may arise regarding the specifications, procedural, and/or administrative matters. Please contact Jason Tran, P.E., Associate Engineer at (714) 562-3680 and/or jasontran@buenapark.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The scope of work shall include the following: 1. Project Management and Coordination a. Project Management A kick-off meeting with the City of Buena Park staff and the Consultant will be held prior to beginning work to review and refine the work program and schedule, identify critical milestones, and determine appropriate paths of communication. Consultant shall produce a baseline schedule of work and conduct periodic meetings (phone conference and coordination meetings) with the City to discuss progress. Deliverables o Schedule of work - updated biweekly o Meeting minutes for all design meetings b. Project Coordination Consultantshall coordinate major design requests and changes with the City, neighboring Cities, agencies, and other constituents that may provide design input, suggestions or restrictions for the project. Design may be altered through additional coordination efforts.

Final Planning

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

3

6

3

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
571
Active Projects
287
Bidding Soon
3,959
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

October 24, 2025

Project location map

Valley View St, Cypress, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.