Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2025 at 8:00 PM
Updated August 23, 2025
Site work and paving for a sidewalk / parking lot in Orlando, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Question Deadline 08/20/2025 at 2:00 PM ET online Q & A Provide all materials, equipment, labor, supervision, applicable permits/inspections/fees and taxes, to professionally demo select (4 sections)sections of concrete sidewalks, remove debris from premises, and to replace approx. of concrete at 301 N Hillside Ave. Installation of approx. 220sf or possibly 674sf (please quote both sizes) depth of pour is to be 8 inches; #5 rebar dowels drilled 4" into the existing slab and 4 inches extending into the new slab spaced 18" apart.3000 PSI concrete with commercial fiber grade mesh. Finish to be broomed and a truncated dome slab for detectable warning. All forms and overpoured concrete to be removed and voids filled to match surrounding grade. Contractor is to securely cordon off the entire work area using yellow caution tape to provide a safety barrier until work is completed. Provide all materials, equipment, labor, supervision, applicable permits/inspections/fees and taxes, to professionally demo select (4 sections)sections of concrete sidewalks, remove debris from premises, and to replace approx. of concrete at 301 N Hillside Ave. Installation of approx. 220sf or possibly 674sf (please quote both sizes) depth of pour is to be 8 inches; #5 rebar dowels drilled 4" into the existing slab and 4 inches extending into the new slab spaced 18" apart.3000 PSI concrete with commercial fiber grade mesh. Finish to be broomed and a truncated dome slab for detectable warning. All forms and overpoured concrete to be removed and voids filled to match surrounding grade. Contractor is to securely cordon off the entire work area using yellow caution tape to provide a safety barrier until work is completed.
Post-Bid
Sidewalks / Parking Lot
$800,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
September 19, 2025
301 N Hillside Ave, Orlando, FL
Related To This Project
Orlando, FL
Bid Date: Aug 26 2025
Orlando, FL
Bid Date: Sep 18 2025
Orlando, FL
Bid Date: Sep 16 2025
Orlando, FL
Bid Date: Dec 10 2025
Orlando, FL
Bid Date: Oct 28 2025
Orlando, FL
--
Orlando, FL
Bid Date: Sep 03 2025
Orlando, FL
Bid Date: Sep 19 2025
Orlando, FL
Bid Date: Aug 15 2025
Orlando, FL
Bid Date: Jan 12 2021
Orlando, FL
Bid Date: Sep 02 2025
Orlando, FL
Bid Date: Oct 21 2025
Orlando, FL
Bid Date: Sep 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
