Published December 8, 2025 at 7:00 PM

Updated December 9, 2025

Demolition and new construction of a water / sewer project in Concord, New Hampshire. Completed plans call for the demolition of a water / sewer project; and for the construction of a water / sewer project.

**As of October 22, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Steeplegate Mall Pump Station Upgrades - New submersible pump station, new electrical building, demolition of existing pump station, site work Completion- 365 calendar days for substantial completion. 426 calendar days for final completion. Liquidated damages will be in the amount of $2,000 for each calendar day of delay from the date established for substantial completion, and $2,000 for each calendar day of delay from the date established for final completion. Work Included: Upgrading the City of Concord's, Steeplegate Mall Pump Station. The major proposed work under this Contract includes: 1. Construction of: a. Duplex submersible pump station; b. Wet well; c. Large bubble mixing system for wet well; d. Valve vault; e. Electrical building; f. Natural gas fueled standby generator; g. Natural gas service extension; h. SCADA system integration; i. Piping, site work, equipment systems, structures, instrumentation, control and electrical systems, as indicated on the Drawings. j. Other appurtenances as shown on the Drawings and specified herein. 2. Demolition of: a. Existing duplex dry-pit pump station; b. Existing wet well; c. Existing electrical building; d. Piping, conduit, etc., as indicated on the Drawings; e. Other removals/demolitions as shown on the Drawings and specified herein. 3. Renovation of: a. Manhole structures; b. Remove and/or relocate equipment as indicated on the Drawings. Removals, Relocations, and Rearrangements 1. Examine the existing site for the work of all trades which will influence the cost of the work under the bid. This work shall include removals, relocations and rearrangements which may interfere with, disturb or complicate the performance of the work under the bid involving systems, equipment and related service lines, which shall continue to be utilized as part of the finished project. The Contractor is responsible for all coordination in this regard. 2. Provide in the bid a sufficient amount to include all removals, relocations, rearrangements and reconnections herein specified, necessary or required to provide approved operation and coordination of the combined new and existing systems and equipment. Question Deadline 09/16/2025 Any questions or inquiries must be submitted in writing, and must be received by the Purchasing Agent no later than seven (7) calendar days before the Request for Bids due date to be considered. Any changes to the Request for Bids will be provided to all Bidders of record.

Award

Water / Sewer

$2,037,000.00

Public - City

Demolition, New Construction

47

24

11

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
423
Active Projects
189
Bidding Soon
3,315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

October 23, 2025

Project location map

270 Loudon Rd, Concord, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.