Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Renovation of a military facility in Jacksonville, North Carolina. Completed plans call for the renovation of a military facility.
Only Mechanical MACC Contractors listed on the General Requirements cover page are eligible to submit a proposal for this project within the ROICC Camp Lejeune area of responsibility. Project no- FA3089-13-D-0003-0012 SCOPE OF WORK: The contractor shall provide all material, labor, equipment, and supervision required to accomplish the following: Detailed Requirements and Specifications: The contractor shall make site visits coordinated with PWD, Scotty Sholar-910-389-4418 Chiller Specifications and Basis of Design. 1. All chilled water piping and strainers shall be cleaned prior to installation of new chiller. See attachment for hydronic pipe cleaning and flushing procedures. 2. Replace chilled water pumps and drives on all chiller installs. Pump must meet the manufacturer specifications for each chiller. 3. Chiller can have brazed plate heat exchangers if manufacture can provide a 10-year parts, labor, and refrigerant warranty the entire chiller. In addition to adding a bypass line that allows the chiller to be isolated from the rest of the chilled water piping loop for post-installation/pre-startup system flushing. A factory installed water strainer shall also be included for each chiller. 4. Chiller shall be equipped with a 20amp GFCI convenience outlet for maintenance to be performed. Chiller disconnects shall be replaced along with the flexible liquid tight conduit and connectors between disconnect and the chiller. New disconnect shall meet the manufacturers recommendations. Heat Trace shall protect the evaporator and all piping that is subject to freezing. All field installed heat tracer must be tested prior to installing pipe insulation. The 20amp heat trace circuit shall be on a separate circuit. It is the responsibility of the contractor to verify circuit is active. If not, a new circuit shall be run. 5. Chiller shall include single point power connection to a non-fused disconnect switch with through-the-door handle and compressor circuit breakers.
Post-Bid
Military
$300,000.00
Public - Federal
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2025
October 20, 2025
Multiple Locations, Jacksonville, NC
Related To This Project
Jacksonville, NC
Bid Date: Sep 16 2025
Jacksonville, NC
Bid Date: Sep 16 2025
Jacksonville, NC
--
Jacksonville, NC
Bid Date: Sep 18 2025
Jacksonville, NC
Bid Date: Sep 18 2025
Jacksonville, NC
--
Jacksonville, NC
--
Jacksonville, NC
Bid Date: Sep 26 2025
Jacksonville, NC
Bid Date: Sep 09 2025
Jacksonville, NC
--
Jacksonville, NC
Bid Date: Aug 22 2025
Jacksonville, NC
Bid Date: Aug 25 2025
Jacksonville, NC
Bid Date: Aug 22 2025
Jacksonville, NC
--
Jacksonville, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.