Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2025 at 8:00 PM
Updated September 3, 2025
Renovation of a mixed-use development in Kennesaw, Georgia. Completed plans call for the renovation of a educational facility.
Quotes from qualified vendors to deliver and install four (4) industrial high volume low speed (HVLS) ceiling fans for the CCSD Kennesaw Warehouse to improve air flow. SCOPE OF WORK The vendor must provide all personnel, equipment, supplies, tools, materials, and all non personal services necessary for purchase and to install four (4) industrial HVLS ceiling fans. Vendors shall inspect the site where the fans are to be installed and to familiar themselves regarding all general conditions that may affect the cost of contract, to the extent that the information is reasonable obtainable at the pre-quote site visit. The hours of operation for the CCSD Kennesaw Warehouse are 8:00 am to 3:00 pm, Monday through Friday, excluding federal and district holidays for the operation side of the warehouse. Food and Nutrition side of the warehouse, prefers installation to be during a district holiday. Vendors are to provide industrial high volume low speed (HVLS) ceiling fans: 2.4.1 (2) 18 ft. Diameter and (2) 20 ft. Diameter fans 2.4.2 Minimum number of blades: 5 2.4.3 Aluminum material 2.4.4 Neodymium magnet motor rated IP66, 277 volts 2.4.5 UL Standard 507 and CSA standard 22.2 NO. 113 2.4.6 Standard upper mount to I-beams and bar joints 2.4.7 Double safety cable system, airfoil retainers, hub safety clips, grade 8 hardware, fire relay, guy wires and airfoil restraint system 2.4.8 Controller rated IP55, on/off and variable speed control All equipment must be new. Installation 2.6.1 Vendor is responsible for notifying the owner's representative listed above, for the delivery and installation date prior to delivery of fans. 2.6.1.1 Vendor must deliver and install on the same day, unless otherwise requested in writing by the district. 2.6.1.2 Vendor must give owner's representative at least two (2) business days' notice for delivery. 2.6.2 The industrial ceiling fan must be mounted to structural beams and shall have safety cables. 2.6.3 The vendor must hang the industrial ceiling fan with mount from the manufacturer and installed in accordance with manufacturer specifications. 2.6.4 The vendor must make electrical connections from the industrial ceiling fan to the power panel AHA located in Audiology electrical closet and panel HF in the electrical closet located in the Food and Nutrition Area Supervisors area. 2.6.5 Structural grade 8.8 bolts must be used for mounting. 2.6.6 Wiring must be in electrical conduit (no exposed wires). 2.6.7 The vendor must ensure that all possible deflection, vibration, torque, along with other such detrimental forces are considered, controlled, and eliminated as necessary. 2.6.8 The vendor must provide and install all necessary metal conduit, fittings, boxes wire, and switches to ensure a properly working and code compliant ceiling fan system. 2.6.9 The vendor must install a ceiling fan control box for each fan. 2.6.10 If any components are found to be defective or DOA (Dead on Arrival), it is the vendor's responsibility to obtain replacement parts. A warranty call should not be required. Question Deadline August 26, 2025 @ 3:00 PM ET
Post-Bid
Warehouse / Distribution
$100,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2025
October 2, 2025
6975 Cobb International Blvd NW, Kennesaw, GA
Related To This Project
Kennesaw, GA
Bid Date: Aug 26 2025
Kennesaw, GA
Bid Date: Oct 31 2025
Kennesaw, GA
Bid Date: Nov 13 2025
Kennesaw, GA
Bid Date: Sep 19 2025
Kennesaw, GA
Bid Date: Sep 18 2025
Kennesaw, GA
Bid Date: Sep 25 2025
Kennesaw, GA
Bid Date: Sep 30 2025
Kennesaw, GA
Bid Date: Sep 25 2025
Kennesaw, GA
Bid Date: Sep 25 2025
Kennesaw, GA
--
Kennesaw, GA
Bid Date: Oct 01 2025
Kennesaw, GA
--
Kennesaw, GA
Bid Date: Aug 20 2025
Kennesaw, GA
Bid Date: Sep 03 2025
Kennesaw, GA
Bid Date: Aug 19 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
