BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Site work and outdoor lighting for a road / highway in Livermore, California. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

The Project is located at East Avenue between S Livermore Avenue and Vasco Road; at Aaron Street between Holmes Street and S Street; at Via Granada east of El Dorado Drive; at Oak Street between K Street and Livermore Avenue; at Elm Street between P Street and O Street; at P Street between Locust Street and Pine Street; at Q Street between College Avenue and P Street; at Wall Street east of Judith Way; and at Pestana Way between Vista Court and Jensen Street, and is described as follows: Street lighting improvements by installing new streetlights, replacing lightbulbs on existing streetlights, tree trimming, minor pavement restoration within sidewalks, and installing new bollard lights at Carnegie Park. Time for Completion. The planned timeframe for Substantial Completion of construction of the Project is 50 Working Days after the commencement date stated in the Notice to Proceed. Final Completion of the Project is planned to be 20 Working Days after the date of Substantial Completion. Each Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included in the Contract Documents. The successful bidder will be required to provide performance and payment bonds each in the amount of 100% of the Contract Price and a Warranty Bond in the amount of 15% of the Contract Price. City reserves the right to reject any and all bids and to waive any non-substantive irregularities. Question Deadline 09/09/2025 Questions regarding the Project, the bid procedures, or the meaning or intent of the Contract Documents must be submitted in writing to the Engineer Juan Tenorio Questions received less than seven days before the deadline for bid submission might not be answered

Award

Roads / Highways

$617,951.00

Public - City

Outdoor Lighting, Site Work

29

20

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
587
Active Projects
299
Bidding Soon
3,075
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2025

October 16, 2025

Project location map

Multiple Locations, Livermore, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.