Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
Site work and paving for a civil project in Livermore, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Reference Number 0000389548 Question Deadline 06/26/2025 at 2:30 PM PT Questions are submitted online No Questions regarding the Project, the bid procedures, or the meaning or intent of the Contract Documents must be submitted in writing to the Engineer: Leo Sum, Assistant Civil Engineer Community Development Department, Engineering Division City of Livermore 1052 S. Livermore Ave Livermore, CA 94550 Email: lysum@livermoreca.gov and Leon Taing, Senior Civil Engineer Community Development Department, Engineering Division City of Livermore 1052 S. Livermore Ave Livermore, CA 94550 Email: lbtaing@livermoreca.gov The project is located at the intersection between the Arroyo Mocho and Holmes Street in Livermore as shown on Sheet C1 of the bid plans. The work is divided into two parts: bank stabilization at the north bank of the downstream end and sediment removal adjacent and underneath the bridge. At the time of bid opening and for the duration of the Project, Contractor shall possess a valid California contractor's license for the following classification(s): Class A (General Engineering) (See also, Instructions for Bidders, Section 4, Licenses and DIR Registration). A bid submitted by a bidder that does not possess any of these licenses at bid opening may render the bid non-responsive, barring award of the Contract to that bidder. The successful bidder will be required to provide performance and payment bonds each in the amount of 100% of the Contract Price and a Warranty Bond in the amount of 15% of the Contract Price. The planned timeframe for Substantial Completion of construction of the Project is 25 Working Days after the commencement date stated in the Notice to Proceed. Final Completion of the Project is planned to be 10 Working Days after the date of Substantial Completion.
Bid Results
Roads / Highways
$606,970.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2025
August 4, 2025
Multiple Locations, Livermore, CA
Related To This Project
Livermore, CA
Bid Date: Jul 15 2025
Livermore, CA
Bid Date: Jul 10 2025
Livermore, CA
Bid Date: Aug 08 2025
Livermore, CA
Bid Date: Jul 22 2025
Livermore, CA
--
Livermore, CA
Bid Date: Aug 21 2025
Livermore, CA
Bid Date: Sep 16 2025
Livermore, CA
Bid Date: Jul 01 2025
Livermore, CA
Bid Date: Nov 07 2025
Livermore, CA
Bid Date: May 28 2025
Livermore, CA
Bid Date: Jun 11 2025
Livermore, CA
Bid Date: Jun 25 2025
Livermore, CA
Bid Date: Jun 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
