Published August 20, 2025 at 8:00 PM
Updated September 9, 2025
This is a service / maintenance or supply contract in Fredericton, New Brunswick. Contact the soliciting agency for additional information.
.1 Provide material, tools, labour and supervision necessary to assist the commissioning agent in the verification of commissioning of the equipment and systems as outlined in the drawings, specifications and functional performance test forms. .2 Contractors and Manufacturer Representative are to participate in the commissioning process and cooperate fully with the Third-Party Commissioning Agent (CxA). .3 Once the Contractor and Manufacturer Representative have completed their start-up, testing, commissioning and troubleshooting, provide material, tools, labour and supervision to verify in detail with the CxA that the equipment and systems have been commissioned in accordance with this and related Sections. This includes verification of system performance as outlined in the individual equipment Specification Sections. .4 Commissioning to be a line item in Manufacturers cost breakdown. Commissioning is a planned program of tests, procedures and checks systematically carried out on equipment, systems and integrated systems of the finished project to verify that they meet the owner`s project requirements. Commissioning is performed after systems and integrated systems are completely installed, functional and the Contractor`s and Manufacturer Representative's responsibilities have been completed and approved. .1 Verify installed equipment, systems and integrated systems operate in accordance with the owner`s project requirements, the contract documents and design criteria and intent. .2 Verify equipment performance as outlined in the individual equipment Specification Sections. .3 Verify that O&M personnel have been fully trained in all aspects of the installed equipment and systems. .4 Verify that proper documentation relating to the commissioned equipment and systems are compiled and provided to the Owner. .3 A third-party commissioning agent will perform commissioning verification of the new equipment and control sequences. This will include start-up verification activities and functional performance testing activities, including testing of system performance. .4 Manufacturer Representative participates in the commissioning process, assisting with operation of equipment and systems, troubleshooting and making adjustments as required. .1 Systems to be operated at full capacity under various modes to determine if they function correctly and consistently at peak efficiency. Systems to be operated interactively with each other as intended in accordance with contract documents and design criteria. .2 During these checks, adjustments to be made to enhance performance to meet environmental or user requirements. .3 Commissioning process includes the testing and verification on the equipment performance, as outlined in the individual equipment Specification Sections. .5 Static Verification forms, Start-up Verification forms and Functional Performance Test forms will be provided by the Commissioning Agent for completion by the Contractor and Manufacturer. .6 Manufacturer factory test reports, start-up reports, installation checklists, performance measurement forms to be provided as part of the required submittals.
Post-Bid
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2025
October 8, 2025
To Be Determined, Fredericton, NB
Related To This Project
Fredericton, NB
Bid Date: Oct 02 2025
Fredericton, NB
Bid Date: Sep 09 2025
Fredericton, NB
Bid Date: Sep 09 2025
Fredericton, NB
Bid Date: Oct 02 2025
Fredericton, NB
Bid Date: Sep 24 2025
Fredericton, NB
Bid Date: Oct 16 2025
Fredericton, NB
Bid Date: Oct 01 2025
Fredericton, NB
Bid Date: Oct 06 2025
Fredericton, NB
Bid Date: Sep 09 2025
Fredericton, NB
Bid Date: Sep 03 2025
Fredericton, NB
Bid Date: Sep 05 2025
Fredericton, NB
Bid Date: Sep 04 2025
Fredericton, NB
Bid Date: Aug 25 2025
Fredericton, NB
Bid Date: Sep 15 2025
Fredericton, NB
Bid Date: Sep 18 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.