Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 13, 2025 at 8:00 PM
Updated October 14, 2025
Renovation of an educational facility in Madison, Wisconsin. Completed plans call for the renovation of a educational facility.
OWNER: State of Wisconsin, Department of Administration, Division of Facilities Development, hereinafter termed DFD. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. All bids received from contractors who are not certified will be rejected. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website DFD Contractor Certification page at online. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of: replacement, relocation, and/or construction of new steam, chilled water, electric, signal, and domestic water utilities at MMHI. Storm water utilities will also be improved to properly drain new and existing utility corridors. New electrical ductbanks will be provided to serve the heating plant and the chilled water plant and facilitate new distribution throughout the campus. New steam and chilled water distribution piping will extend from the heating plant and chilled water plant. These utilities will be extended to a point of connection to existing or will be capped in anticipation of extension in the future. New high-pressure steam, low pressure steam, condensate, and signal and electrical duct banks will be extended from MMHI across Troy Drive to serve the Central Wisconsin Center campus steam and electrical utilities. The chilled water piping service for the CWC campus will be relocated to facilitate the construction of a new water treatment facility to be constructed as part of another project. A new water main will extend from an existing water main to facilitate new water distribution throughout the campus. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Contract offer and construction phase records will be processed electronically. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Bidding Documents will be available online immediately upon the project being advertised for bid. Event Bid Description: Hand delivery to the drop box labelled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703. The bidder is responsible for the sealed bid being delivered to the indicated location or submitted via the online before the time specified for the bid submission. Third party delivery is entirely at the bidder's risk. Question Deadline 09/01/2025 Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least ten (10) days before MEP bidding commences. Bid Result Mechanical Hooper Corporation $2,887,750.00 Electrical Wil-Surge Electric, Inc. $318,825.0
Award
Educational
$3,206,575.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2025
December 1, 2025
301 Troy Dr, Madison, WI
Related To This Project
Madison, WI
Bid Date: Nov 21 2025
Madison, WI
Bid Date: Oct 03 2025
Madison, WI
Bid Date: Sep 16 2025
Madison, WI
Bid Date: Sep 25 2025
Madison, WI
Bid Date: Oct 14 2025
Madison, WI
Bid Date: Oct 30 2025
Madison, WI
Bid Date: Sep 26 2025
Madison, WI
Bid Date: Jan 27 2026
Madison, WI
Bid Date: Sep 30 2025
Madison, WI
Bid Date: Aug 20 2025
Madison, WI
Bid Date: Aug 26 2025
Madison, WI
Bid Date: Aug 15 2025
Madison, WI
Bid Date: Sep 02 2025
Madison, WI
Bid Date: Sep 11 2025
Madison, WI
Bid Date: Aug 29 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
