Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 23, 2025 at 8:00 PM
Updated October 24, 2025
Site work for a playground / park / athletic field in Grantham, New Hampshire. Completed plans call for site work for a playground / park / athletic field.
The Grantham Village School seeks proposals for the Preschool Playground at the elementary school with the exact location being 75 Learning Drive, Grantham, NH. The timeline for this project would be a start date as early as September 12, 2025 and completed by November 30, 2025. The District reserves the right to request additional information or clarification of any submitted proposals. Proposals and proposal pricing must remain open for sixty (60) days. This solicitation will become an addendum to any resultant contract. Proposals may be withdrawn or modified by the submitting firm at any time before the closing date and time for receipt of proposals. The RFP is not a low-bid price competition. Instead, proposals will be reviewed in accordance with the Evaluation Criteria stated within this RFP. This RFP supersedes all other proposals, oral and written, and all negotiations, conversations, or discussions between the parties related to the subject matter. Contract award will be based on bestperceived value to the Grantham School District. Current Status: The current preschool playground is small with wood chips for ground cover and not ADA compatible for all students ages 3-5. Enlarged playground area, ground cover and equipment is needed to service the current population of preschool students. Scope of Services: The school district has set a definite budget for all of the equipment and work discussed above. The proposal shall include the cost of the installation and the playground equipment as outlined below. All equipment will be: ADA compliant and suitable for early childhood and preschool students ages 3-5; compliant with commercial playground structures for inground mounting; be manufactured from durable, non-toxic, and weather-resistant materials. Must be compliant with public playground safety standards of American Society for Testing and Materials (ASTM) and the Consumer Product Safety Commission (ASTM and CPSC). o Poured in place, fully installed rubber playground surfacing to cover a 30' x 50' area. ADA (Americans with Disabilities Act) accessibility preferred with a fall height of 5 feet. o ADA-Compliant Equipment: Must include accessible ramps, sensory panels, and ground-level play components that meet the requirements of ADA. o Playground system to include slides, activity panels, climbing activities, ground level activities, sensory panels and installation. o Musical activity panel set and installation. o Climbing wall with tunnel and installation o Bubble wall or similar equipment and installation. o Similar equipment to promote gross motor and fine motor development, multi-sensory, music and movement, and dramatic play and installation. o Professionally install all playground equipment and safety surfacing according to manufacturer's specifications and all applicable safety standards. o Clean up the site upon completion of the project, including the removal of all debris and excess materials. o Provide a final safety inspection and certification of compliance.
Award
Playgrounds / Parks / Athletic Fields
$122,700.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 5, 2025
September 12, 2025
75 Learning Dr, Grantham, NH
Related To This Project
Grantham, NH
Bid Date: Jun 19 2025
Grantham, NH
Bid Date: Mar 20 2025
Grantham, NH
Bid Date: May 24 2022
Londonderry, NH
Bid Date: Sep 17 2025
Manchester, NH
--
Manchester, NH
--
Milford, NH
--
Moultonborough, NH
--
Moultonborough, NH
--
Nashua, NH
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
