BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2025 at 8:00 PM

Updated October 8, 2025

Site work, paving and new construction of a mixed-use development in Louisville, Kentucky. Completed plans call for site work for a educational facility; for paving for a sidewalk / parking lot; and for the construction of a educational facility.

**As of October 7, 2025 , this project has not yet been awarded. The project is expected to be awarded by the end of the month.** The project is located on the Jefferson Community and Technical College Downtown campus in Louisville, KY and consists of approximately 2.5 acres of exterior green space with various amenities, sidewalks and minimal surface parking. Formerly a very large surface parking lot, two buildings are currently under construction on the east and west sides of the block that is bounded by 1st and 2nd Streets and West Broadway to the south. A new Science Building fronts 1st Street to the east and a new Parking Structure fronts 2nd Street to the west. Existing college academic buildings are located on the northern portion of the block that fronts Chestnut Street, and the Administration Building is at the corner of 1st Street and W. Broadway. The existing surface car parking will be demolished with the exception of a small portion of the existing lot that is adjacent to W. Broadway and will serve the retail tenants in the southeastern corner of the Parking Structure. In place of the asphalt pavement, topsoil will be imported to support shade trees and lawns. Sidewalks will provide pedestrian circulation through the quadrangle that is formed by the buildings, as well as Emergency vehicle access. Amenities include a small, terraced seating area that may serve as an outdoor classroom, benches, dining tables, a miniature synthetic turf soccer field, corn hole boards, a disc golf target, a location for a public art installation, lighting, ornamental fencing and security cameras for safety. Perimeter masonry signage will be constructed at each of the three street frontages that will identify the space as the "College Green", as well as JCTC and the private donor that is making the project possible. *Per the Architect, the scale is incorrect on the irrigation plan and the irrigation sleeve. The scale should be 1-20, not 1-30. An Addendum will not be issued as it is too close to the bid date*

Bid Results

Sidewalks / Parking Lot

$3,025,000.00

Public - State/Provincial

New Construction, Paving, Site Work

26

27

18

7

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
80
Bidding Soon
1,620
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

November 11, 2025

Project location map

101 W Broadway, Louisville, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.