Site work for a water / sewer project in Wakefield, Massachusetts. Completed plans call for site work for a water / sewer project.

2025 Water Main Improvements :- The work to be performed will include furnishing and implementing temporary water main by-pass for multiple locations; replacing water mains, water services, fittings, gates, curb stops, fire hydrants, and all appurtenances and any other incidental work as required and shown on the plans. Street Names: Approximate Length: Emerson Street 1,875 LF Gould Street 500 LF Main Street 5,700 LF Wharton Park - Add Alt #1 950 LF Aborn Avenue - Add Alt #2 1,710 LF Court Street - Add Alt #2 300 LF The work to be performed will include replacing water mains, fittings, gates, water main temporary bypass (as necessary), and all other related work and other incidental work as required and shown on the plans. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. prequalification of contractors with the class of work as Sewer & Water for the project with an estimated value of $4.3 million Doc.Note :- Contract Documents are available for examination on or after Friday, August 22, 2025 at the offices of Wakefield Public Works - Engineering Division at 1 Lafayette Street, first floor, Wakefield Massachusetts, 01880, between the hours of 8:30 A.M. - 4:30 P.M., Monday through Thursday, and 8:30 A.M. to 12:30 P.M. Friday, excluding holidays. CONTRACT TIME - 420 Calendar Days CONTRACTOR agrees to complete work for Emerson Street (between Chestnut Street and Gould Street) and Gould Street between the end of school, approximately June 10, 2026, and the beginning of school, approximately September 1, 2026, to avoid school drop-off and pick-up traffic for St. Joseph's School. Question Deadline 09/05/2025 No oral interpretation will be made to any bidder as to the meaning of any of the Contract Documents or be effective to modify any of the provisions of the Contract Documents. All questions shall be submitted in writing to the Engineer at least seven (7) days before the established date for bid opening.

Award

Water / Sewer

$2,457,553.00

Public - City

Site Work

23

7

2

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
583
Active Projects
282
Bidding Soon
3,423
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

November 14, 2025

Project location map

Multiple Locations, Wakefield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.