Published September 11, 2025 at 8:00 PM

Updated September 12, 2025

Demolition and site work for an educational facility in Los Angeles, California. Working plans call for the demolition of a educational facility; and for site work for a educational facility.

**As of September 11 , 2025 project has been canceled. As of this time it is unknown if an when project will rebid. The 5 story Medical Office Building (MOB) is located at 5901 West Olympic Boulevard, approximately 6 miles east of the UCLA Campus and is approximately 95,607 GSF. The proposed project would include seismic improvements on all floor levels and interior tenant improvements of approximately 34,000 GSF of space on floors 1-3. The MOB has a current Seismic Performance Rating of V. Upon completion of the work, the MOB would achieve a Seismic Performance Rating of IV or better and bring the facility into compliance with the UC Seismic Safety Policy. The proposed seismic work will include the installation of approximately 34 seismic dampers placed at specified locations on the inside perimeter of the building's exterior walls. The dampers will be installed diagonally and attached at the bottom and top of the existing steel column bays requiring incidental fireproofing at beam and column modifications. Steel reinforcing plates will be added to existing steel beams and columns to support the installation of seismic damper brackets. Additional seismic reinforcing is required at the existing rooftop mechanical penthouse and at the building foundation at locations along the 1st floor seismic dampers. In addition to the seismic work, work would also include partial restoration of interior building finishes impacted by the installation of the seismic braces. Limited MEP investigation and safe-off work is anticipated. Site and building accessibility improvements would include path of travel upgrades along the city sidewalk and building entrance, installation of new ADA handrails and guardrails at existing interior stairs. New accessible signage, restrooms and a drinking fountain are also anticipated. The anticipated construction cost of the project is: $39,100,000 Bid Package 02A-Demolition Description: The anticipated demolition scope includes demolition of existing doors, frames and hardware, partial demolition of slab for new building utilities and shaft, demolition of existing interior and exterior walls and curtain walls for new doors, miscellaneous interior finish demolition, mechanical demolition, plumbing demolition, electrical demolition, existing fire dry stand pipe, existing fire suppression back-flow preventer demo, existing concrete pavement, planter wall, storage enclosure and miscellaneous site items. LICENSE REQUIREMENTS: The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid In addition, the University is committed to promoting and increasing participation of small business enterprises (SBEs) and disabled veteran business enterprises (DVBEs) relating to all goods and services covered under the awarded agreement, subject to any and all applicable obligations under state and federal law, and University policies. The awarded contractor shall make best efforts to provide qualified SBEs and DVBEs with the maximum opportunity to participate. Please email ContractsAdministration@capnet.ucla.edu for further information. The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements. Pre Bid Note: Dial by your location 1 213 338 8477 US (Los Angeles) 1 669 219 2599 US (San Jose) 1 971 247 1195 US (Portland) 1 253 215 8782 US (Tacoma) 1 346 248 7799 US (Houston) 1 602 753 0140 US (Phoenix) 1 720 928 9299 US (Denver) 1 301 715 8592 US (Washington DC) 1 312 626 6799 US (Chicago) 1 470 250 9358 US (Atlanta) 1 646 558 8656 US (New York) 1 651 372 8299 US (Minnesota) 1 786 635 1003 US (Miami) Find your local number: https://ucla.zoom.us/u/adJIVaI7XH Description: 1. The Work of this Contract is divided into phases as indicated herein and in Article 5 of the Agreement. 2. All of the work required for each phase, as shown on the drawings and as specified, shall be fully completed within the time stipulated for the phase, and all Work of the Contract shall be fully completed within the Contract Time, whether or not included in the phase description. The deadlines for completion of each phase shall be subject to adjustment under the Contract procedures for adjustment of the Contract Time, including those procedures specified in Articles 4 and 8 of the General Conditions. 3. University reserves the right to vary the sequence of phasing upon written notice to Contractor prior to the date on which Contractor is to proceed with the work of any phase affected by the change. 4. Phase 1: a. The Work of Phase 1 shall include pre-construction services specified in the Bidding Documents, complete. b. To be completed within 395 days from the date designated in the Notice to Proceed for this phase. 5. Phase 2A: a. The Work of Phase 2A shall include seismic construction services specified in the Bidding Documents, complete. b. To be completed within 395 days from the date designated in the Notice to Proceed for this phase. 6. Phase 2B: a. The Work of Phase 2B shall include tenant improvements construction services specified in the Bidding Documents, complete. b. To be completed within 455 days from the date designated in the Notice to Proceed for this phase. ALTERNATE NUMBER: 1 Description: Furnish insurance coverage in excess of UCIP limits specified in Article 11 of the General Conditions of the Prime Contract to meet minimum limits indicated in Swinerton Master Subcontract Agreement. Subcontractor must fully comply with UCIP policy and Swinerton Master Subcontract Agreement insurance requirements.

Final Planning

Educational

$450,000.00

Public - State/Provincial

Demolition, Site Work

552

82

4

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
0
Bidding Soon
1,768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

March 11, 2026

Project location map

5901 W Olympic Blvd, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.