BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2025 at 8:00 PM

Updated September 19, 2025

Site work and paving for a road / highway in Grafton, Vermont. Working plans call for site work for a road / highway; and for paving for a road / highway.

Additional 2025 Paving Location #1: Paving TH#1 - Route 121 East beginning near the Rushton Farm traveling 600' +/- X 22' X 1". The above-described section will consist of shim and overlay. The contractor shall shim the 600' +/- X 22' X 1" with type IV hot mix to regain crown and shed water and to fill in ruts at the discretion of the contractor. This project requires Tack Coat prior to paving. Rubber tire roller and two steel drum rollers are required for the job. The beginning and end of the project need to have joints ground. Adequate transitions to match intersecting roadways and driveways are required. All paved areas must be 22 feet side to side to conform to the State of Vermont Standards. The contractor is responsible for flaggers and any other traffic control necessary in accordance with the State of Vermont Agency of Transportation and Manual on Uniform Traffic Control Devices. Location #2: Paving a portion of TH#1 - Route 121 East, near 1694 Route 121 East for 850' +/- X 22' X 1". The above-described section will consist of shim and overlay. The contractor shall shim the 850' +/- X 22' X 1" with type IV hot mix to regain crown and shed water and to fill in ruts at the discretion of the contractor. This project requires Tack Coat prior to paving. Rubber tire roller and two steel drum rollers are required for the job. The beginning and end of the project need to have joints ground. Adequate transitions to match intersecting roadways and driveways are required. All paved areas must be 22 feet side to side to conform to the State of Vermont Standards. The contractor is responsible for flaggers and any other traffic control necessary in accordance with the State of Vermont Agency of Transportation and Manual on Uniform Traffic Control Devices. All work required herein must take place between September 2, 2025, and October 15, 2025. The Town of Grafton reserves the right to accept or reject any and all bids and has the right to accept any other than the lowest bid if determined to be in the best interest of the Town.

Final Planning

Roads / Highways

$23,562.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
410
Active Projects
214
Bidding Soon
2,893
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2025

March 18, 2026

Project location map

VT-121, Grafton, VT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.