BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Site work for a civil project in North Miami Beach, Florida. Completed plans call for site work for a water / sewer project.

Question Deadline 10/17/2025 Each such request must be in the hands of the Engineer at least five (5) days before the date for the formal opening of bids, or by the close of the Request for Information (RFI) period, whichever is earlier, in order that interpretation or clarification may be issued by the Engineer in the form of written addenda, mailed or delivered to all prospective Bidders. Scope of Work - This project will construct a pump station to serve the new Municipal Injection Wells. The project also includes the construction of the above-ground facilities for five injection wells, their corresponding well houses, two monitoring wells, an Effluent Energy Recovery System Building, and site development. Project Duration: 878 Calendar Days to Substantial Completion, 907 Calendar Days to Final Completion, plus a 91 Calendar Day Contingency Period Estimated Range of the Base Bid - $142,988,869.66 to $173,008,632.35, not including contingency and dedicated allowances. Event pre-bid note: A Mandatory Virtual Pre-Bid will be held using Microsoft Teams . Any bidder joining the meeting after 10:15 a.m. will be considered late and will be disqualified from submitting a Bid. The link to the pre bid meeting is Event Site Walkthrough note: Since the plant is a facility with restricted access, Bidders are encouraged to also invite any of their trade subcontractors, specialty subcontractors or vendors to this event. Participants attending the site visit must wear personal protection equipment (PPE) including hardhat, safety glasses, safety shoes and safety vest. The Board of County Commissioners, Miami-Dade County, Florida, reserves the right to reject any or all bids, to waive any informality in any bid or to re-advertise for bids. Bids from any person, firm or Corporation in default on other contracts or agreements with the County may be rejected. Failure by the Bidder to satisfy claims on previous contracts with the County may be cause for rejection of his bid. The County reserves the right to postpone or cancel the bid opening at any time prior to the scheduled opening of bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$173,008,632.00

Public - County

Site Work

540

44

137

6

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
0
Bidding Soon
1,005
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

January 13, 2026

Project location map

2575 NE 156th St, North Miami Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.