Published December 5, 2025 at 7:00 PM
Updated December 6, 2025
Site work for a civil project in Saint Louis, Missouri. Completed plans call for site work for a water / sewer project.
**As of November 13th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Project consists of the construction of improvements located at Powder Valley Conservation Nature Center. Improvements generally include the installation of a new equalization tank and waterproofing of an existing wastewater treatment plant. DESCRIPTION OF ALTERATIONS WORK A. Plumbing: +Alter existing system and add new construction, keeping existing in operation. B. Electrical Power and Lighting: +Alter existing system and add new construction, keeping existing in operation. 1. Milestone 1: Initital Site Work a. Duration: 45 Working Days b. Contractor mobilize to site and set up temporary fencing for Construction Area. c. Install erosion control measures and start clearing, grubbing, and demolition. d. Rough grading and preperation for Milestone 2 activities shall be completed. This includes all materials onsite to complete Milestone 2 activitites e. The Contractor shall not start any activities that disrupt the operation of Powder Valley Conservation Nature Center (CNC). 2. Milestone 2: Waterproofing operations and Equalization Tank installation. a. Duration: 14 Calendar Days (consecutive days) b. Shut down wastewater treatment plant and completely waterproof. Return wastewater treatment plant to a fully operational service level at the end of Milestone 2. c. Install equalization tank. The Contractor shall have the option to bypass the equalization tank utilizing an internal section of pipe that is supported. 3. Milestone 3: Final Site Work a. Duration: 31 Working Days b. The Contractor shall complete all other items within the Contract. This generally includes a fully operational equaliztion tank, concrete pavements, retaining wall, storm sewer utility, electric utility, fencing, and final landscaping (seed/ rock). Estimate: $400,000 - $550,000 Location - 11715 Cragwold Road, Kirkwood, MO 63122 Est. Value Notes: Range: $400,000 - $550,000 MBE 10%, WBE 5% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Pre-Bid Note- Pre-Bid Meeting Conference Room Located between I-270 and Geyer Road, just north of I-44. On I-44, take the S. Lindbergh Boulevard exit south 0.50 mile, then take Watson Road west, then Geyer Road north to Cragwold Road. Turn west on Cragwold and watch for signs. Question Deadline 09/17/2025 Every request for interpretation shall be made in writing and submitted with all supporting documents not less than seven (7) calendar days before opening of bids. The request shall be sent directly to the Infrastructure Management Branch, Missouri Department of Conservation, 2901 West Truman Blvd., P.O. Box 180, Jefferson City, Missouri 65102. The Bidder agrees to complete the work within Ninety (90) Working Days Design Questions: Jacob Novak, Design Project Manager Phone No. 573-522-4115 Ext. 3725 Bidding Questions: Veronica Mecko, Contract Specialist Phone No. 573-522-4115 Ext. 3744, or Fax 573-522-2324 E-mail Veronica.Mecko@mdc.mo.gov
Award
Water / Sewer
$464,730.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 24, 2025
October 24, 2025
11715 Cragwold Rd, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Sep 10 2025
Saint Louis, MO
Bid Date: Sep 15 2025
Saint Louis, MO
Bid Date: Sep 26 2025
Saint Louis, MO
Bid Date: Sep 09 2025
Saint Louis, MO
Bid Date: Sep 10 2025
Saint Louis, MO
Bid Date: Aug 26 2025
Saint Louis, MO
Bid Date: Sep 19 2025
Saint Louis, MO
Bid Date: Sep 26 2025
Saint Louis, MO
Bid Date: Aug 21 2025
Saint Louis, MO
Bid Date: Aug 29 2025
Saint Louis, MO
Bid Date: Sep 04 2025
Saint Louis, MO
Bid Date: Sep 30 2025
Saint Louis, MO
Bid Date: Sep 12 2025
Saint Louis, MO
Bid Date: Sep 18 2025
Saint Louis, MO
Bid Date: Sep 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.