Site work for a water / sewer project in Saint Louis, Missouri. Completed plans call for site work for a water / sewer project.
The work to be done under this contract consists of the construction of approximately 130 lineal feet of pipe sewers 30 inch in diameter and appurtenances to be constructed in an area located north of interstate 64/40 and east of Jefferson Avenue, in the City of St. Louis, Missouri. The Engineers Opinion of Probable Cost for this project is $395,000. A. Bids will be received only from companies that are prequalified by the District's Engineering Department for Deep Sewer Construction. B. The Bid Proposal shall be prepared on a Proposal Form, provided by the District, in accordance with Section 2.3, FORM OF PROPOSAL of the General Project Specifications. Bids not submitted on District provided forms will be rejected. The proposal shall be accompanied by a certified check or cashier's check on a bank or trust company in St. Louis County or in the City of St. Louis or by a bidders bond, for an amount not less than five (5%) percent of the bid amount as bid security to the District. C. The work to be done under this contract consists of the construction of approximately 130 lineal feet of pipe sewers 30 inch in diameter and appurtenances to be constructed in an area located north of interstate 64/40 and east of Jefferson Avenue, in the City of St. Louis, Missouri. D. If, within twenty-four (24) hours after bids are opened, any bidder files a duly signed, written notice with the Executive Director along with supporting documents that demonstrates to the reasonable satisfaction of the District that there was a material and substantial mistake (other than judgment) in the preparation of its bid, that bidder may be allowed to withdraw its bid and the bid security will be returned. I. Within fifteen (15) days after acceptance of the bid proposal, the successful bidder must have on file Certificates with the District that he has obtained, and will continue to carry, Comprehensive Automobile Liability, Workers' Compensation, and Comprehensive General Liability Insurance as required by the contract documents. The District reserves the right to require the successful bidder to file proof of his ability to properly finance and execute the project, together with his record of successful completion of similar projects. The District reserves the right to reject any and all bids, offers or proposals submitted, to accept the proposal that it deems to be to its best interest, or to advertise for new bids. The District reserves the right to defer the acceptance of any proposal and the award and execution of a contract for a period not exceeding ninety (90) days after the date of opening the bids. The successful bidder, whose proposal has been accepted, shall sign the Contract in duplicate, and return the signed documents within fifteen (15) days after the date of their receipt. At the same time the successful bidder shall also file with the District two (2) copies of both a Contract Bond for one hundred (100%) percent of the contract amount, and an acceptable Certificate of Insurance and Insurance Binder or policy for the required insurance coverage. J. The Contractor shall commence work within ten (10) days after the date of written notice from the District to begin and shall complete all work within one hundred fifty (150) calendar days after the expiration of such ten (10) day period. If the Contractor does not comply with the foregoing without a written, District approved explanation he may be removed from the list of eligible bidders for future District construction projects until further notice. The sewers will be constructed in public rights-of-way and in easements previously secured by the Sewer District. The District reserves the right to eliminate some of the construction work throughout the project, either before or after entering into a contract. No claim will be allowed for anticipated profits or damages in connection with any work so eliminated by the District, provided the total value of changes together with all previous changes, is not in excess of twenty-five (25%) percent of the original monetary amount of the bid. Question Deadline 09/19/2025 Interpretations or clarifications considered necessary in response to prospective bidders' questions prior to the opening of the Bid will be issued by Addenda mailed or delivered to all pre-qualified bidders who have purchased plans and specifications. Questions received less than 5 days prior to the date for opening the bids will not be answered. Question concerns contact Shonnah Paredes sparedes@stlmsd.com. 1.4. MINORITY BUSINESS ENTERPRISE UTILIZATION AND WORKFORCE PROGRAMS: The Metropolitan St. Louis Sewer District (District) has established subcontractor goals for Building Construction (21% MBE and 10% WBE) and Non-Building Construction (10% MBE and 10% WBE) in the amount of $50,000 or more. Workforce goal requirements of 37% Minority, 11% Women, and 46% Apprentice (when applicable) apply to contracts in the amount of $500,000 or more. The requirements are further explained in the attached Business Diversity Utilization and Workforce Program document. 14073-[C1 -P1 ]
Award
Water / Sewer
$479,894.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 26, 2025
October 27, 2025
Olive St, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Sep 09 2025
Saint Louis, MO
Bid Date: Sep 10 2025
Saint Louis, MO
Bid Date: Aug 26 2025
Saint Louis, MO
Bid Date: Sep 19 2025
Saint Louis, MO
Bid Date: Sep 26 2025
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Aug 29 2025
Saint Louis, MO
Bid Date: Sep 04 2025
Saint Louis, MO
Bid Date: Sep 15 2025
Saint Louis, MO
Bid Date: Sep 10 2025
Saint Louis, MO
Bid Date: Sep 24 2025
Saint Louis, MO
Bid Date: Aug 21 2025
Saint Louis, MO
Bid Date: Aug 29 2025
Saint Louis, MO
Bid Date: Sep 04 2025
Saint Louis, MO
Bid Date: Sep 30 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.