Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 23, 2025 at 8:00 PM
Updated September 24, 2025
Site work and renovation of a civil project in Homer City, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Cherry Run Pump Station General Mechanical, Pump Station Electrical, Sanitary Sewer Line Extension PUMP STATION GENERAL/MECHANICAL - CONTRACT 1/2025 PUMP STATLON EECTRICAL - CONTRACT 2/2025 SANITARY SEWERLINE EXTENSION - CONTRACT 3/2025 A certified check, payable to the Central Indiana County Joint Sanitary Authority, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to 10 percent (10%) of the total of the Bid shall be submitted with each bid to guarantee the Bidder's entrance into a contract if given the award. No bid bond shall be waived or returned because the Bidder has failed to or cannot comply with any requirements set forth in the plans, specifications, or any applicable statutes of the Commonwealth of Pennsylvania, or any applicable municipal ordinances. This project is being funded in whole or in part by the Commonwealth of Pennsylvania Commonwealth Financing Authority. All contractors must adhere to Act 127 of 2012 (Public Works Employment Verification Act), Non-discrimination/Sexual Harassment Provisions, State Contractor Responsibility Program, the Americans with Disability Act, Anti-Pollution Regulations, Prohibition of Illegal Alien Labor on Assisted Project Act, Build America Buy America, American Iron and Steel Act, and the Steel Products Procurement Act. Contractors submitting bids must comply with Disadvantaged Business Enterprises (DBE) requirements when using subcontractors to openly compete and bid on the project. Pennsylvania Prevailing Wage Rates will apply to this contract. The Central Indiana County Joint Sanitary Authority reserves the right to reject any or all bids or to waive any informalities in the bidding. Award criteria and basis for rejection will be in accordance with the Instructions to Bidders. No bid may be withdrawn for ninety (90) calendar days after the scheduled closing time for receipt of bids. Question Deadline 09/12/2025 If any person contemplating submitting a Proposal is in doubt as to the true meaning of any part of the Drawings, Specifications or other contract Documents, or if he finds discrepancies in or omissions from the Drawings or Specifications, he may submit a written request to the Engineer for an interpretation or correction thereof. All requests for interpretation must be received by the Engineer at least five (5) days before the date set for bid opening.
Bid Results
Water / Sewer
$613,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
