Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 10, 2025 at 8:00 PM
Updated September 11, 2025
Site work for a bridge / tunnel in Boon, Michigan. Completed plans call for site work for a bridge / tunnel.
All materials and all work will be in accordance with the 2020 MDOT Standard Specifications for Construction. Insurance requirements shall be in accordance with the 2020 MDOT Standard Specifications for Construction. Award is contingent upon Board approval. The Wexford County Road Commission, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Sub-Title A, Office the Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contact entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The Board reserves the right to reject any or all bids or any part of the same, to waive irregularities and/or informalities and to make the award in part or entirety in any manner deemed to be in the best interest of the Wexford County Road Commission. Description of Work: The work of this contract involves the removal of the existing culvert and placement of a new 36 Poly Coated CMP culvert per the attached plans. The culvert will be supplied by the WCRC. The existing culvert is very steep. The new culvert will have the downstream invert raised and fill placed to flatten the slope of the structure. The stream downstream of the culvert will have bank rock placed in the washed out area to stabilize the slopes and flatten the stream bottom grade. The contractor will be responsible for all items of work listed in the Bid Proposal and shown in the plans, including any required dewatering. The contractor will provide a plan to control the flow of water during construction of the box culvert. This dewatering plan must be approved by the Road Commission Engineer prior to any construction on this project. The cost of dewatering is to be included in the Lump Sum price of culvert replacement. Restoration will be required on all disturbed areas.
Bid Results
Bridges / Tunnels
$41,600.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2025
October 3, 2025
Multiple Locations, Boon, MI
Related To This Project
Boon, MI
Bid Date: Sep 23 2025
Boon, MI
Bid Date: Oct 27 2025
Boon, MI
Bid Date: May 27 2021
Boon, MI
Bid Date: Nov 13 2025
Boon, MI
Bid Date: Oct 29 2025
Boon, MI
Bid Date: Nov 25 2025
Boon, MI
Bid Date: Feb 21 2019
Boon, MI
Bid Date: Dec 24 2025
Boon, MI
Bid Date: Aug 25 2025
Boon, MI
Bid Date: Sep 23 2025
Boon, MI
--
Boon, MI
Bid Date: Aug 11 2025
Boon, MI
Bid Date: Jul 28 2025