BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Site work for an educational facility in Storrs Mansfield, Connecticut. Completed plans call for site work for a educational facility.

Project intent is to bring athletics, research, clinical operations as well as entrepreneurial academics together in one building that can build upon each other. A more integrated approach to campus life, with an emphasis on recreation, athletic activity, human performance and applied health science. Renovate existing team, coaches, visitor locker rooms for the teams remaining within the fieldhouse to a standard established in the new locker rooms with the Rizza performance center. Scope of Work includes: Renovation of approximately 80,000 GSF of the existing fieldhouse that will meet the University Design Standards and Performance Guidelines. Renovation includes but is not limited to locker rooms including toilets and showers, strength and conditioning room, exercise, rowing tank room, equipment and receiving, academic center office, tutorial, conference space, open study spaces, classroom, kitchen, ergonomic room, sports medicine, exterior access toilet rooms, MEP support space, National C Club office space and general office and conference rooms. Renovation will include infrastructure upgrades including but not limited to, HVAC, mechanical, electrical, telcom, IT, AV, security, fire alarm, fire protection, plumbing, site utilities, roof and envelop repairs/upgrade. Renovation includes abatement of Asbestos Containing Materials (ACM) and may include presumed PCB containing materials. New Exterior entry vestibule and site/landscape improvements. The building is targeting LEED V4 certified certification and will conform to Connecticut High Performance Building requirements. Phase 1 work associated with women's swimming withing Wolff Zackin and include team locker rooms, office, and conference rooms within Wolff Zackin. This work was previously procured and will be ongoing until August 2024. Phase 2 is expected to begin on June 1st, 2025 with substantial completion no later than December 30, 2026. Question Deadline 09/12/2025 at 5:00 PM ET No questions will be accepted. Please send all RFIs to estimating@doc.build.

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Site Work

522

53

218

2

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
7
Bidding Soon
2,967
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

October 27, 2025

Project location map

2095 Hillside Rd, Storrs Mansfield, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.