Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 19, 2025 at 8:00 PM
Updated August 27, 2025
Site work, new construction and renovation of an educational facility in Storrs Mansfield, Connecticut. Completed plans call for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
The purpose of this Request for Qualifications ("RFQ") is for the University of Connecticut (the "University") to request Statements of Qualifications from Companies that can provide General Contractor services. Projects may include new construction, renovation or alteration of existing buildings, and infrastructure. The services requested may be for the University's main campus at Storrs- Mansfield, regional campuses (Avery Point, Hartford School of Law, downtown Hartford, Stamford, and Waterbury), UConn Health (UCH) (Farmington, satellite locations), and any other University property. The University of Connecticut is committed to providing a professionally inclusive environment within which small and minority businesses are encouraged to participate in the procurement experience. As such, we encourage participation by Small (SBE) businesses, Minority-Owned (MBE) businesses, Woman-Owned (WBE) businesses, and businesses owned by persons with a disability (DisBE), certified as such by the Connecticut's Department of Administrative Services Supplier Diversity Division. For further information, visit: online Permitting-and-Codes/Small-Minority-Business-Center. To learn about the University of Connecticut's Supplier Diversity Program, online . Additionally, the University encourages Connecticut-based businesses to participate in this public solicitation process. (FOR PROJECTS ESTIMATED AT $1,000,000 OR MORE REQUEST FOR STATEMENT OF QUALIFICATIONS) & Remove Project value The Set-Aside Requirement for a Project is that (1) not less than thirty percent (30%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Small Business Enterprises" ("SBEs") and (2) not less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Minority Business Enterprises" ("MBEs") (the 10% set aside for MBEs may be included in the 30% set aside for SBEs). If the Contractor is an S/MBE, then any self-performed work may be included in the Set-Aside Requirement. The Contractor is responsible for ensuring that they, and the S/MBEs they have selected, are eligible Connecticut-certified S/MBE contractors. PROGRAM LOCATIONS: Storrs Campus, Regional Campuses, UConn Health Locations, and any other University property A draft of the contract that will be used on individual projects has been provided with the solicitation documents for reference only. The University reserves the right to modify the contract or waive any informality as it deems to be in the best interest of the University. o New construction or renovation of existing buildings and spaces including but not limited to the following: research & teaching laboratories, health service buildings, food service facilities, residential buildings, lecture halls and hi-tech classrooms, historical buildings, office spaces, administrative buildings, athletics facilities. o Oversee a construction project to ensure it is completed safely, on time, and in accordance with the contract documents. Coordination of multiple trades for all divisions of work including but not limited to the following: o Demolition work, abatement and disposal of hazardous materials o Light and Heavy earthwork and hauling, Utilities, infrastructure (above ground and underground) o Concrete and masonry work o Landscape and irrigation o Mechanical/HVAC, electrical, plumbing and related equipment installation o Steel fabrication and erection and miscellaneous metals fabrication and installation o Roofing and waterproofing/exterior siding & trim o Glass and glazing, windows, doors, and hardware installation o Interior framing and finishing, carpentry, painting, ceiling installation o Fire alarm/fire protection systems installation o Data and communications cabling and equipment installation o General requirements such as rigging, site fencing, wayfinding o General insulation installation o Millwork fabrication and/or installation o Installation and/or fabrication of graphics and signage o Security cameras, card access devices o Lab and/or medical equipment installation Question Deadline 08/14/2025 at 2:00 PM ET All Requests for Information (RFI) questions are to be posted under the Q&A Board Tab in the HuskyBuy sourcing event for this Solicitation. No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted.) Certificate of Prequalification is planned to be issued by: September 30, 2025 o Program will commence: October 1, 2025 o Program duration: One (1) year. The University reserves the right to extend the Certificates of Prequalification for up to two (2) additional 1-year extensions. A Certificate of Prequalification will be issued to those prequalified Companies and will be effective for one year after issuance. The University will have the option to extend the Certificate of Prequalification for up to two (2) additional 1-year extension, upon completion of a re-certification process.)
Post-Bid
Educational
$1,000,000.00
Public - State/Provincial
New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2025
October 1, 2025
Multiple Locations, Storrs Mansfield, CT
Related To This Project
Storrs Mansfield, CT
Bid Date: Aug 12 2025
Storrs Mansfield, CT
Bid Date: Aug 20 2025
Storrs Mansfield, CT
Bid Date: Sep 09 2025
Storrs Mansfield, CT
--
Storrs Mansfield, CT
Bid Date: Sep 03 2025
Storrs Mansfield, CT
Bid Date: Sep 16 2025
Storrs Mansfield, CT
Bid Date: Oct 02 2025
Storrs Mansfield, CT
Bid Date: Sep 25 2025
Storrs Mansfield, CT
Bid Date: Jul 22 2025
Storrs Mansfield, CT
Bid Date: Jul 29 2025
Storrs Mansfield, CT
Bid Date: Jul 17 2025
Storrs Mansfield, CT
Bid Date: Apr 30 2019
Storrs Mansfield, CT
Bid Date: Apr 08 2019
Storrs Mansfield, CT
Bid Date: Jun 19 2025
Storrs Mansfield, CT
Bid Date: Jun 12 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
