BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2026 at 7:00 PM

Updated January 10, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Flint, Michigan. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

FLINT, MI -- Flint officials want to hire two engineering companies to draw up plans for replacing two of the city's most deteriorated bridges, including one that serves as a primary route to Hurley Medical Center. Members of the City Council gave initial committee approval to contracts with Rowe Professional Services and Wade Trim during committee meetings on Aug. 20, the next step in replacing the bridges on Grand Traverse Street and Western Road. Both contracts still require approval in a regular council meeting. Construction isn't expected until at least 2027. Documents provided to council members on Wednesday say that Western Road bridge over Kearsley Creek was selected by the state Department of Transportation for construction in the 2027 fiscal year. A review of the Grand Traverse bridge over the Flint River did not include a construction date estimate, and the city did not immediately comment on when work might begin. City Engineer Abdul Khandker said both bridges, as well as several others in Flint, are in very bad condition, raising the potential for issues like falling concrete. Plans call for the bridge superstructures -- the portion of bridges above ground level -- to be replaced. Khandker estimated the cost of replacing the Western Road bridge at roughly $2 million with the Grand Traverse span expected to cost roughly $3.3 million. As of January 6, 2026, this project is in the preliminary design phase. The architect has not been identified and information regarding the method of general contractor selection is unavailable. A firm construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Final Planning

Bridges / Tunnels

$3,300,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
251
Bidding Soon
2,299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2027

Project location map

N Grand Traverse St, Flint, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.