BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2025 at 8:00 PM

Updated August 30, 2025

Renovation of a water / sewer project in Fairfield, California. Completed plans call for the renovation of a water / sewer project.

The Fairfield-Suisun Sewer District (District) is requesting Bids from State of California Class A licensed and qualified contractors to repair a corroded shouldered-end coupling connection on a 20-inch pump discharge pipeline at the District's Central Pump Station facility. The work is located in Fairfield, CA. The District will use its standard Construction Services Contract to enter into an agreement with the selected Contractor for the work specified herein. A copy of the Construction Services Contract is included as Appendix B of this RFB. Contractors shall carefully review the Agreement prior to submission of a Bid. Submission of a Bid is the Contractor's acknowledgement that the terms and conditions of the Agreement are acceptable to the Contractor. The principal contact with the District will be: Melvin Aquino - Assistant Engineer 707-428-9164, maquino@fairfieldsuisunsewer.ca.gov Any questions on the content or intent of anything contained in this RFB shall be submitted in writing to the District, and answers to those questions may be shared with all Contractors. The District makes no assurances that questions received within three (3) business days of the Bids due date shall be answered. Due date for Contractor questions August 26, 2025 at 5pm General Project Scope a. Furnish a fabricated steel pipe sleeve with shouldered end and furnish new shouldered ends for an existing pipe spool to accommodate field welding and reinstallation of the existing coupling. b. Cut and remove a portion of the existing pipe and existing shouldered-ends that interface with the existing coupling. c. Field-bevel/taper the inner surfaces of the fabricated pipe sleeve and shouldered end, repeating as necessary to adjust alignment of the fabricated pipe spool piece with the adjacent pipe spool piece to within the minimum separation and deflection limits of the existing coupling. d. Field-weld the fabricated pipe sleeve to the existing wall penetrating pipe and shouldered end to the existing pipe spool. e. Miscellaneous pipe coating removal and protective coating application.

Post-Bid

Water / Sewer

$100,000.00

Public - City

Renovation

9

10

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
7
Bidding Soon
1,597
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2025

September 10, 2025

Project location map

918 Illinois St, Fairfield, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.