Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Site work for a swimming pool in Genoa, Illinois. Completed plans call for site work for a swimming pool.
The Genoa Park District is seeking bid proposals for painting the main and baby pools at the Chamberlain Park Pool. This project is subject to the Illinois Prevailing Wage Act. The Genoa Park District Board of Commissioners reserves the right to waive technicalities and to reject any or all bids For questions or further information, contact Paul Bafia, Executive Director at pbafia@genoaparks.com or by phone at (815) 784-5612. BRIEF DESCRIPTION OF WORK: 1. Work can begin once the pool is closed, and the pool is drained which will be before September 15th, 2025. Work will need to completed in the Fall of 2025. 2. Acid Etch all painted surfaces 3. Water blast entire pool surfaces to be painted at 0 degree turbo nozzle at 4000-5000 PSI 4. Apply (2) coats Commercial grade blue epoxy pool paint. 5. Apply non-slip sand finish on all exit stairs and baby pool. 6. Lap lane lines, safety lines and other markings in black commercial grade epoxy solid black paint. 7. Clean up and properly dispose of all waste and residue off site. 8. In consultation with the Owner after the pool is drained, evaluate and remove, if necessary, existing caulk from expansion joints and re-caulk. The joint primer/sealant shall be Vulkem #171/Vulkem #116 one-part non-sag polyurethane and shall be applied to a thickness of _" in strict conformance with manufactures specifications. 9. In consultation with the Owner after the pool is drained, evaluate and patch, if necessary, concrete surface of the vessel. Material to be used is a two component, cement based acrylic polymer. 10. Work must be completed in the fall of 2025. 11. Any damage to the area from equipment used by the contractor shall be repaired by the contractor. LOCATION OF WORK The location of the work is at the Chamberlain Park Pool located at 400 E. Second St in Genoa, Il 60135 Contractors shall inform themselves of all the conditions under which the work is to be performed concerning the site of the work, the obstacles that may be encountered, and all other relevant matters concerning the work to be performed under this contract.
Award
Swimming Pools
$25,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2025
September 16, 2025
400 E 2nd St, Genoa, IL
Related To This Project
Genoa, IL
Bid Date: Sep 28 2021
Genoa, IL
Bid Date: Jan 27 2026
Genoa, IL
Bid Date: Jan 27 2026
Genoa, IL
Bid Date: Feb 26 2026
Genoa, IL
Bid Date: Jun 19 2025
Genoa, IL
Bid Date: Jan 27 2026
Genoa, IL
Bid Date: May 22 2025
Genoa, IL
Bid Date: Mar 27 2025
Genoa, IL
Bid Date: Mar 27 2025
Genoa, IL
Bid Date: Feb 19 2025
Genoa, IL
Bid Date: Jun 13 2025
Genoa, IL
Bid Date: Oct 21 2024
Genoa, IL
Bid Date: Jul 17 2024
Genoa, IL
Bid Date: Jun 14 2024
Genoa, IL
Bid Date: Apr 05 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
