BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2025 at 8:00 PM

Updated September 30, 2025

Renovation of a mixed-use development in Howell, New Jersey. Completed plans call for the renovation of a educational facility.

The HVAC Alterations at AES, GES, MES located in Howell Township, Monmouth County, New Jersey. Bid No. 09-25 HVAC Alterations - Phase 2 Located at: Adelphia Early Childhood Center 495 Adelphia Rd, Freehold, NJ 07728 DOE #: 25-2290-003-23-1000 Greenville Elementary School 210 Ramtown-Greenville Rd, Howell Township, NJ 07731 DOE #: 25-2290-045-23-1000 Memorial Elementary School 485 Adelphia Road, Freehold, NJ 07728 DOE #: 25-2290-012-23-1000 The Work consists of: Replacement of the existing air handling units and controls with packaged air-cooled chillers at each of the three (3) school locations. The new AHUs will be connected to the recently upgraded air cooled chiller units and controls integrated with an existing supervisory station. Partial roof replacement of a built-up roof system at one school. Question Deadline 09/12/2025 Any questions or requests for clarifications shall be submitted in writing to the Architect's office by EOB. E-mail questions to jwengrzynek@ssparchitects.com and include the project #9032.2. The project scope includes, but not limited to, removing the existing air handling system including an indoor, custom, built-up air handler, an indirectly evaporatively cooling unit, condenser water system, and hydronic coils at three schools. The intent is to replace these systems with a custom air handler ducted to hot and chilled water coils, then connect to the school's hot deck and cold deck air distribution systems, and integrating the existing Johnson Metasys controls into the existing Distech supervisory network. The design includes adding exhaust fans to divorce the exhaust air from the return air systems. One school includes approximately 2,000sf of multi-ply SBS built up roofing. The Bidder hereby affirms that all Work embodied within this Contract will be Substantially Complete prior to August 29, 2026. The Contractor is advised that work on the Project site is not expected to commence prior to June 24, 2026.

Post-Bid

Educational

$700,000.00

Public - County

Renovation

83

15

18

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
895
Active Projects
410
Bidding Soon
6,108
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.