Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 13, 2025 at 8:00 PM
Updated October 14, 2025
Site work and paving for a bridge / tunnel in Pultney Township, Ohio. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The Department will indicate the work type required for each pay item. If the line item does not have a corresponding work type, NR will be shown in the work type column. This proposal note will govern the assignment of work types to pay items. However, the Contractor may perform incidental work items for which it does not hold the required work type provided the cost of the work does not exceed 5% of the total bid. The Contractor may also perform Work Type 26 (Structural steel painting) without holding the required work type provided the total area to be painted does not exceed 1000 SF per structure. The Contractor may not perform any quantity of Work Type 55 or 56 unless they hold the required work type. The Contractor may perform Work Type 57 (Sealing of Concrete Surfaces with Epoxy or Non-Epoxy Sealers) without holding the required work type provided the total area to be sealed does not exceed 75 SY per project. Proposal Nm: BEL119917 County: BELMONT DBE Goal: 4.50 BRIDGE REPAIR C/R/S: BEL-SR 149-05.32 Completion Date: 7/31/2026 for Improving a Section of Sr 149 in the Township of Pultney, County of Belmont, State of Ohio, in Accordance With the Plans and Specifications of the Department of Transportation by Increasing the Resiliency of Bidge No. Bel-149-08.560 Carrying Sr 149 Over Little Mcmahon Creek by Repairing Peir Column Drilled Shafts, Replacing Rock Channel Protection, and All Related Work. OHDOT - Bridge Repair - SR 149
Bid Results
Bridges / Tunnels
$440,328.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2025
November 10, 2025
OH-149, Pultney Township, OH
Related To This Project
Pultney Township, OH
Bid Date: Sep 25 2025
Pultney Township, OH
Bid Date: Feb 22 2024
Pultney Township, OH
Bid Date: Nov 29 2023
Pultney Township, OH
Bid Date: Mar 29 2023
Pultney Township, OH
Bid Date: Jun 29 2022
Pultney Township, OH
Bid Date: Jun 01 2022
Waynesville, OH
Bid Date: Sep 12 2025
Cleveland, OH
--
Attica, OH
Bid Date: Oct 10 2025
Warren, OH
Bid Date: Aug 28 2025
Cincinnati, OH
--
Marietta, OH
Bid Date: Aug 28 2025
Marietta, OH
Bid Date: Aug 28 2025
Hiram, OH
Bid Date: Aug 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
