BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Renovation of a multi-residential development in Toronto, Ontario. Completed plans call for the renovation of a multi-residential development.

Toronto Community Housing Corporation (TCHC) is seeking a Vendor for the provision of Design Build - Central Steam Plant Boilers in Regent Park. The existing central steam plant provides critical heating and DHW services to buildings in Regent Park. As the plant is scheduled for decommissioning, TCHC is seeking a temporary boiler solution using gas-fired rental boiler units. This solution is expected to be in place for five years or more until the buildings between Sumach Street and River Street are demolished. The buildings in question that need an alternate heating arrangement but are currently serviced by the steam plant are more clearly identified in the plan below. These buildings are bounded by Sumach Street, River Street, Gerrard Street and Oak Street. The targeted occupancy of the buildings between Sumach Street and River Street will likely be 60-70 percent, which means that approximately 114 units could be occupied. The existing infrastructure from the steam plant, feeding the buildings between Sumach and River Street will be disconnected once the alternate heating arrangement is in place. However, the steam plant building per se, is proposed to be retained. Once the alternate heating arrangement for buildings between Sumach Street and River Street is commissioned, the steam plant infrastructure/piping installed between Sackville Street and Sumach Street will be disconnected, removed and disposed and the buildings between Sackville Street and Sumach Street will be demolished. Question Deadline 09/19/2025 at 4:00 PM ET Deadline to submit Questions Online Carole Cicchetti All inquiries are to be directed through the messaging function in the e-Procurement Portal The targeted occupancy of the buildings between Sumach Street and River Street will likely be 60-70 percent, which means that approximately 114 units could be occupied. The existing infrastructure from the steam plant, feeding the buildings between Sumach and River Street will be disconnected once the alternate heating arrangement is in place. However, the steam plant building per se, is proposed to be retained. Once the alternate heating arrangement for buildings between Sumach Street and River Street is commissioned, the steam plant infrastructure/piping installed between Sackville Street and Sumach Street will be disconnected, removed and disposed and the buildings between Sackville Street and Sumach Street will be demolished. Intent to Bid Due Date: Oct 23rd 2025, 2:00 PM EDT

Post-Bid

Multi-Residential

$200,000.00

Public - City

Renovation

61

6

12

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
496
Active Projects
281
Bidding Soon
4,977
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

April 8, 2026

Project location map

407 Gerrard St E, Toronto, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.