BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 13, 2025 at 8:00 PM

Updated October 14, 2025

Site work and paving for a road / highway in Kingfisher, Oklahoma. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Notice is hereby given that the Board of County Commissioners of Kingfisher County will receive sealed bids on labor and materials necessary for the application of chips & oil on county roads in all three districts. Statement of Work and Specifications of the project to be bid located online at Kingfisher.okcounties.org under the bids tab and also available from the purchasing agent located in the Kingfisher County Clerk's office and the County Engineer's office. A Pre-Bid meeting will be held September 8th, 2025 in the office of the County Commissioners at the Kingfisher County Courthouse at 10:00am (101 S Main St RM 9, Kingfisher, OK 73750) The Board of County Commissioners reserves the right to reject any or all bids. All bidders must complete a statement of non-collusion and a Cashier's Check, a certified check, or a surety bid bond in the amount of five percent (5%) of the gross amount of base bid as a guaranty, shall accompany the sealed proposal of each bidder. Deposits will be returned to the unsuccessful bidders and successful bidders, upon approval of the contract and submission of a 100% Performance Bond, a 100% Statutory Bond, and a 100% Maintenance Bond and to show certificates of Insurance, its limits, and Workers Compensation Insurance. Please contact Kingfisher County Clerk's office for bid results at 405-375-3887. The County will make repairs to the roadway prior to any chip and seal application. The winning bidder shall ensure the road surface shall be cleaned of all foreign materials prior to application ofBituminous Asphaltic Materials. General Cleaning: Cleaning ofroadway surface shall be accomplished by self-propelled power broom or brooms. Each power broom unit shall be equipped with an AMBER colored strobe light to caution traffic to its presence on the roadway. Sweeping - Single Coat: Roadway shall be swept clean of all dust and foreign materials before binder oil is applied. After rock chips have been spread, rolled, and cured all loose chips shall be swept off roadway surface within 48 hours. Sweeping - Double Coat: After the 1st coat of binder oil is applied and rock chips are spread, rolled, and cured, loose chips will be swept offthe roadway before the 2nd coat of binder oil is applied. After the 2nd coat of binder oil is applied and rock chips are spread, rolled, and cured, loose chips will be swept from the roadway surface within 48 hours.

Award

Roads / Highways

$600,000.00

Public - County

Paving, Site Work

5

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
58
Bidding Soon
776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2025

October 20, 2025

Project location map

Multiple Locations, Kingfisher, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.