Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 10, 2026 at 7:00 PM
Updated February 11, 2026
Demolition, site work and asbestos abatement for an educational facility in Goleta, California. Completed plans call for the demolition of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.
As of February 2026, this scope of work had already been pre-qualified. No additional bids will be accepted by the construction manager. Construction is slated to begin in June 2026. The Student Housing Infill & Redevelopment Project will provide much needed student housing and student life amenities to undergraduates to meet the residential need of the campus for 3,500 new beds outlined in the University’s Long Range Development Plan (LRDP). The project will be accomplished in two phases on two distinct sites. The first phase, San Benito Student Housing, will provide approximately 2,225 beds and will be located on the current Facilities Management Site (FM Site) with a planned occupancy for the Fall quarter of 2027. The second phase, East Campus, will provide a separate residential facility for 1,687 beds integrated amongst the existing East Campus residential halls, with a planned opening for the Fall 2029 quarter. These 1,690 beds include 1,278 new beds to reach the 3,500 total new beds in conjunction with San Benito plus 412 residence hall beds to replace the Santa Rosa residence hall being displaced by the project. Of the new beds, 705 will be provided in traditional apartments similar to those in San Benito and the remaining 573 will be in apartment suites, a more efficient floor plan that encourages social interactions to occur primarily outside of the units. Construction Cost Estimate for BP No. 2: $TBD · The overall Project Size is approximately 540,000 Gross Square Feet. · The project consists of five buildings with multiple turnover dates. · Includes existing facility demolition of Ortega & Santa Rosa buildings and site utility relocation. · Includes a Central Utility Plant and Dining Hall facility.
Award
Educational
$495,000,000.00
Public - State/Provincial
Asbestos Abatement, Demolition, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2025
June 8, 2026
6789 Navigator Dr, Goleta, CA
Related To This Project
Goleta, CA
Bid Date: Nov 06 2025
Goleta, CA
Bid Date: Nov 06 2025
Goleta, CA
--
Goleta, CA
Bid Date: Dec 04 2025
Goleta, CA
Bid Date: Feb 12 2026
Goleta, CA
Bid Date: Mar 05 2026
Goleta, CA
Bid Date: Mar 30 2026
Goleta, CA
Bid Date: Aug 26 2025
Goleta, CA
Bid Date: Aug 21 2025
Goleta, CA
Bid Date: Aug 04 2025
Goleta, CA
Bid Date: Jul 15 2025
Goleta, CA
Bid Date: Jul 14 2025
Goleta, CA
Bid Date: Jun 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
