Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 26, 2025
Site work and new construction of a warehouse / distribution facility in Gaithersburg, Maryland. Completed plans call for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.
The City of Gaithersburg is seeking sealed proposals to secure the services of a qualified and experienced Contractor to design and build two shelter structures at the Public Works Maintenance Facility, as identified in a recent Maryland Department of the Environment General Permit for Discharges from Stormwater Associated with Industrial Activities (Permit No. 20-SW) inspection. Permit language requires the DPW facility to maintain good housekeeping and minimize sediment and pollutant runoff into the storm drain system. Question Deadline 09/11/2025 at 5:00 PM ET All questions regarding this Solicitation: (i) shall be submitted by email to the Procurement Division, at procurement@gaithersburgmd.gov; This is a non-exhaustive list of tasks that must be performed for this project. If Offeror is unable The solicitation number and title must be included in the subject line of the email. Any and all questions received not in compliance with this paragraph will not be answered unless the City, at its sole discretion, deems that a response to a question is necessary to clarify anything in the Solicitation Documents to perform task, it must be indicated in the proposal submission. A. Construction of 13 concrete material storage bays with side walls, rear walls, all-weatherresistant roofing, and interior lighting, with the following considerations and materials required: i. Storage Bay Walls a) Material: Precast concrete panels or interlocking concrete blocks, materials must be able to withstand heavy loads and accidental impacts from machinery. ii. Design: Panels can be installed vertically or horizontally between steel columns. Interlocking blocks like Legato, Duo(TM), or Vee(R) blocks offer flexibility for future expansion and meet fire-resistance standards. iii. Height Panels can be customized up to 12 feet in height, allowing for significant storage capacity. Roofing: i. All-Weather: Metal roofing or rubberized flashing cement may be used for additional protection against water leaks and extreme temperatures. C. Interior Lighting: energy-efficient LED lighting systems to ensure proper illumination while reducing energy consumption. D. Each Offeror shall acquaint themselves thoroughly as to the character and nature of the work to be done, making careful examination of the site. No plea of ignorance of conditions that exist will be accepted as an excuse for any failure or omission on the part of the Contractor to fulfill in every detail all of the requirements of a resilient contract. E. Offeror must attend all pre-construction, post-construction and weekly progress meetings (Project Manager will determine if in-person or virtual meetings will be held).
Post-Bid
Warehouse / Distribution
$1,500,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 25, 2025
January 26, 2026
800 Rabbitt Rd, Gaithersburg, MD
Related To This Project
Gaithersburg, MD
Bid Date: Sep 19 2025
Gaithersburg, MD
Bid Date: Sep 11 2025
Gaithersburg, MD
Bid Date: Oct 16 2025
Gaithersburg, MD
Bid Date: Sep 18 2025
Gaithersburg, MD
Bid Date: Oct 29 2025
Gaithersburg, MD
--
Gaithersburg, MD
--
Gaithersburg, MD
Bid Date: Sep 11 2025
Gaithersburg, MD
Bid Date: Aug 29 2025
Gaithersburg, MD
Bid Date: Sep 11 2025
Gaithersburg, MD
Bid Date: Sep 19 2025
Gaithersburg, MD
Bid Date: Sep 05 2025
Gaithersburg, MD
Bid Date: Oct 28 2025
Gaithersburg, MD
Bid Date: Aug 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
