BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Renovation of a museum in Las Vegas, Nevada. Completed plans call for the renovation of a museum.

Preconstruction Services shall include constructability reviews, construction cost estimates, advice, project analysis and feedback regarding materials, methods, systems, schedule, labor and other conditions affecting construction and subcontractor selection for development and construction of the Project. Preconstruction services are anticipated to begin November 2025 and construction is anticipated to begin February 2026 with estimated completion August 2026. QUESTIONS DUE DATE : 9/8/2025 05:30:00 PM (PT). QUESTIONS regarding this solicitation must be submitted via the Questions Tab or directed in writing to the Purchasing & Contracts Representative named on the Event Details Tab. Inquiries should be made no later than the date and time specified. Purpose a. The purpose of this report is to provide a written narrative of the pertinent structural concepts for the proposed alterations to the existing Symphony Park Garage B structure, located at 355 Promenade Place, Las Vegas, Nevada. 2. Project Description a. Tenant Improvement in approximately 14,500 total square feet of interior space. b. Mechanical equipment and screening added to existing low roof/canopy element.

Post-Bid

Museum

$3,800,000.00

Public - City

Renovation

15

9

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
10
Bidding Soon
424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

February 1, 2026

Project location map

355 Promenade Pl, Las Vegas, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.