BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2025 at 7:00 PM

Updated December 19, 2025

Renovation of an educational facility in Las Vegas, Nevada. Completed plans call for the renovation of a 1,064-square-foot educational facility.

LAST DAY FOR QUESTIONS: Monday, December 29, 2025 @ 5:00PM PST The Blackfire Kitchen Bar and Coffee Bar Project will complete construction of the bar and coffee bar areas in the Blackfire Kitchen. A project which had been partially developed in 2019. The existing space has partial infrastructure including power, water and sewer, floor drains, some countertops, wall finishes, and millwork. Approximate square footage is 900 s.f. This project will re-use existing utilities and finishes where feasible and provide new infrastructure and finishes as required for a fully operational facility. A large portion of the equipment will be Owner furnished and Contractor installed (OFCI) as noted on the drawings. The equipment is largely automated so low voltage infrastructure is included. This project is being rebid with the following adjustments to the project scope: 1. Eliminate all new doors (provide cased opening to BOH area where doors are removed) 2. Eliminate temporary wall and all work associated with that. Contractor to provide Visqueen (or equal) separation 3. Eliminate wall modification at cubbies: wall to stay as existing 4. Eliminate new floor sink which also eliminates the scanning of the concrete floor 5. Eliminate beverage lines from self-contained Smart Bar 6. Eliminate BOH TV power/data (this wall is currently finished with FRP) Work Included o Selective demolition as indicated on drawings. o Utility extensions and modifications including: o Electrical: Power distribution and low-voltage infrastructure to support automated equipment. o Plumbing: Domestic water, sanitary sewer, floor drains. o Mechanical: HVAC connections, ventilation as shown on drawings. o Lighting: Interior fixtures and controls. o Interior finishes including: wall finishes, flooring and base, ceilings, doors, frames, and hardware. Contractor to provide wall backing as needed for wall hung equipment. o Provide and install equipment as noted on drawings. o OFCI equipment to be installed by Contractor; coordinate rough-ins, utility connections, and clearances. o Contractor to coordinate with Gaming Vendor for installation of equipment and power/data connections as needed. o Ensure all equipment is fully operational at project completion. 2. Detailed Drawings and Specifications: Specifications and/or Drawings for this project are attached as Exhibits. (2025-08-22 UNLV Black Fire Kitchen_combined rebid 11.03.2025 db) 3. Project Completion Date: Completion of this Project must be achieved by no later than May 29, 2026 4. Liquidated Damages in the amount of $1,000 per day will be levied for each day the project is not completed after the required Project Completion Date. 5. Liquidated damages in the amount of $5,000 for substitution of Key Personnel without prior consent.

GC Bidding

Educational

$200,000.00

Public - State/Provincial

Renovation

33

5

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
4
Bidding Soon
425
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

February 13, 2026

Project location map

8400 W Sunset Rd, Las Vegas, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.