Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 16, 2025 at 8:00 PM
Updated September 20, 2025
Site work, new construction and addition to a mixed-use development in Climax Springs, Missouri. Completed plans call for the addition of a 64,388-square-foot, one-story above grade educational facility; for the construction of a educational facility; and for site work for a educational facility.
A. The project consists of the addition of a PEMB metal building and connecting corridor to the existing building. Bid alternates of the project include adding a new connecting corridor and a separate bid alternative of infill the corridor with restroom/locker rooms. The work consists of, but is not limited to, selective demolition of existing elements, site work, new construction with pre-engineered metal building, masonry, casework, concrete, TPO roof systems, electrical, mechanical, plumbing, and interior finish work. The owner will fully occupy adjacent areas during construction. The project is located at Climax Springs R-IV School, 575 Climax Avenue, Climax Springs, MO 65324 in Camden County, Missouri. Missouri Prevailing Wage Rates will apply to the work. The Contractor's company shall have been in business for at least five (5) consecutive years under the current name and ownership and shall be financially sound and solvent. The Company shall have successfully completed projects of similar size and scope. Submission of AIA Form 305, Contractor's Statement of Qualifications shall be submitted to the Architect no later than 5:00 pm, Five (5) calendar days prior to the bid opening, see Section 000500. Bid Bond: Each bid proposal shall be accompanied by a 5% bid security in the form of a cashier's check, a certified check, or a bid bond executed by the bidder and Surety Company. See Instructions to Bidders for more information. Surety/Bonding Company must be acceptable to the Owner and be authorized to transact business in the State of Missouri. The Administration Conference Room is located on the northeast corner of the school directly adjacent from the location of the new PEMB structure. Bidders shall submit a bid in conformance with the Instructions to Bidders in the Project Manual. The Owner reserves the right to accept or reject any or all bids and may waive any or all informalities in the bid process. The Owner's decision regarding the approval/denial of bids are based on various factors such as, but not limited to, quality, time constraints, and service. All decisions will be in the best interest of the district and shall be final. No bids may be withdrawn for a period of Thirty (30) days subsequent to the specified time for receipt of bids. Bidder and any subcontractors must follow and enforce all requirements of Missouri's Prevailing Wage Laws. The Climax Springs School District is an Equal Opportunity Employer and encourages bids from qualified small, minority-owned, and women-owned business enterprises. f any person contemplating submitting a bid for construction of the Work is in doubt as to the true meaning of any part of the proposed Contract Documents, or finds discrepancies in, or omissions from, any part of the proposed Contract Documents, he must submit to the Architect a request for interpretation thereof not later than five days before bids will be opened. Question Deadline 09/12/2025
Post-Bid
Educational
$650,000.00
Public - City
Addition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2025
October 20, 2025
575 Climax Ave, Climax Springs, MO
Related To This Project
Climax Springs, MO
--
Raymore, MO
Bid Date: Sep 23 2025
Nixa, MO
Bid Date: Sep 30 2025
Columbia, MO
Bid Date: Sep 22 2025
Craig, MO
--
Mound City, MO
--
Jameson, MO
--
Mound City, MO
--
Craig, MO
--
Brookfield, MO
--
Bucklin, MO
--
Brookfield, MO
--
Adel, MO
Bid Date: Dec 12 2025
Chillicothe, MO
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
