Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 10, 2025 at 8:00 PM
Updated October 11, 2025
Site work and paving for a bridge / tunnel in Burlington, Connecticut. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Furnishing all labour, tools, materials and equipment required for the Farmington river trail improvements Burlington section project Each bidder must deposit with his/her bid a certified check, or a bid bond, for not less than five percent (5%) of the bid as provided in the information for bidders. A certified check will not be accepted in lieu of a bid bond. No proposal will be accepted unless accompanied by the required bid bond. The attention of the bidders is called to the requirement for minimum wage rates to be paid under this contract. The right is reserved to reject any or all bids in whole or in part, to award any item, group of items, or total bid and to waive any informality or technical defects, if it is deemed to be in the best interest of the town of Burlington No bidder may withdraw their bid within ninety (90) days after the actual date of the opening thereof. Note: this contract is subject to state contract compliance requirements, including non-discrimination statutes and set a side requirements. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract be set aside for award to subcontractors holding current certification as small business enterprises ("Sbe") from the Connecticut department of administrative services ("Das"). A minimum of 6.25% of the state funded portion must be set aside for subcontractors holding current das certification as minority-, women-, and/or disabled owned businesses ("M/w/disbe"). The contractor must demonstrate good faith effort to meet the 25% set-aside goals. Contractors that find discrepancies and/or errors in or between plans, specifications, quantities and other matters, must immediately notify Scott tharra, director of public works, 200 Spielman highway, Burlington, cut 06013 or at tharaus@burlingtonct.Gov
Bid Results
Bridges / Tunnels
$411,845.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
April 1, 2026
Multiple Locations, Burlington, CT
Related To This Project
Burlington, CT
Bid Date: Oct 15 2025
Burlington, CT
Bid Date: Nov 05 2025
Burlington, CT
Bid Date: Feb 10 2026
Burlington, CT
--
Burlington, CT
Bid Date: Apr 24 2025
Burlington, CT
Bid Date: Mar 07 2024
Burlington, CT
Bid Date: Nov 13 2023
Burlington, CT
Bid Date: Jun 08 2023
Burlington, CT
Bid Date: Mar 07 2022
Burlington, CT
Bid Date: Feb 07 2019
Burlington, CT
--
Burlington, CT
Bid Date: Apr 21 2021
West Haven, CT
Bid Date: Sep 12 2025
West Haven, CT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
