BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2025 at 7:00 PM

Updated November 23, 2025

Site work for a water / sewer project in Kankakee, Illinois. Completed plans call for site work for a water / sewer project.

Description: The Project includes the following Work: Installation of new motor control center, new supervisory control center, new standby diesel generator, new automatic transfer switches, new generator docking station, new odor control system, new chemical induction units, new scum pumps, new media for gas scrubber system, and new HVAC equipment. Modification of existing gas chlorination system. Rehabilitation of a screw pump, bar screens, primary clarifiers, and odor control system. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price. Bidders will be required to comply with all laws, including those relating to the employment of labor and the payment of the general prevailing rate of hourly wages in the locality in which the work is to be performed for each craft or type of worker or mechanic needed to execute the contract or perform such work, also the general prevailing rate for legal holiday and overtime work (including, but not necessarily limited to 820 ILCS 130/1-12 the "Prevailing Wage Act") as ascertained by the Illinois Department of Labor for Kankakee County, Illinois shall be paid for each craft or type of worker needed to execute the contract or to perform such work. If at the time this Contract is executed, or if during the term of this Contract, there is excessive unemployment in Illinois as defined in the Employment of Illinois Workers on Public Works Act, 30 ILCS 570, as two consecutive months of unemployment exceeding 5%, CONTRACTOR agrees to employ a work force that consists of at least 90% Illinois laborers. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids. Question Deadline 11/13/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing, All requests for interpretation must be received at least five days prior to the day set for receiving Bids.

Bid Results

Water / Sewer

$8,274,000.00

Public - City

Site Work

50

32

2

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
228
Bidding Soon
3,113
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2025

January 19, 2026

Project location map

To Be Determined, Kankakee, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.