BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work and paving for a sidewalk / parking lot in Peru, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

HMA Shared Use Path Removal (4,572 SY), P.C.C. Shared Use Path 4" (51,329 SF), Aggregate Base Course (904 Tons), and various other related items. Bidders are advised that this Contract will be subject to the Illinois Prevailing Wage Act. The Bid shall be accompanied by a certified check or bid bond, in the amount of five percent (5%) of the gross amount of the bid and be payable to the order of the City of Peru. Bids may be held by the City of Peru for a period not to exceed 60 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The Owner reserves the right to accept or reject any or all Bids and to waive any informalities in the bidding. Bidder agrees that the Work will be substantially complete on or before November 30th, 2025; Final completion - December 7th , 2025 Base Bid: 1 Earth Excavation & Disposal, 10" 2 HMA Shared Use Path, Surface Removal, 2" 3 Aggregate Base Course, Leveling 4 Aggregate Base Course, Type B, 6" 5 P.C.C. Shared Use Path, 4" (8 ft. wide) 6 P.C.C. Shared Use Path, 4" (10 ft. wide) 7 Concrete Materials 8 Restoration Add Alternate Bid: 1 Earth Excavation & Disposal, 10" 2 Aggregate Base Course, Type B, 6" 3 P.C.C. Shared Use Path Expansion, 4" (2 ft. wide) 6 Additional Concrete Materials Question Deadline 09/11/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Bid(5.0%), Performance(100%), Payment(100%), Certified Check

Award

Sidewalks / Parking Lot

$293,853.00

Public - City

Paving, Site Work

3

13

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
221
Bidding Soon
3,061
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

October 20, 2025

Project location map

Multiple Locations, Peru, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.