Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 6, 2025 at 8:00 PM
Updated October 7, 2025
Site work for a water / sewer project in Fort Stockton, Texas. Completed plans call for site work for a water / sewer project.
**As of October 06, 2025, this project has not yet been awarded. The project is expected to be awarded on October 14, 2025.** Contract 2 - Water Transmission and Distribution Line System Improvements Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Installation of approximately 31.8 miles of water transmission and distribution piping and appurtenances. Construction includes approximately 19.8 miles of 16-inch, 4.2 miles of 12-inch, 2.4 miles of 8-inch, 3.4 miles of 6-inch, and 2.0 miles of 4-inch pipe. The project will include bore and casing, slick bores, valves, fire hydrants, flush valves, and other appurtenances for a water system piping project. Question Deadline 09/17/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Andy Vecellio, P.E., avecellio@jacobmartin.com, 325-695-1070, 3465 Curry Lane, Abilene, TX 79606. Contract 2 - Water Transmission and Distribution Line System Improvements: Installation of approximately 31.8 miles of water transmission and distribution piping and appurtenances. Construction includes approximately 19.8 miles of 16-inch, 4.2 miles of 12-inch, 2.4 miles of 8-inch, 3.4 miles of 6-inch, and 2.0 miles of 4-inch pipe. The project will include bore and casing, slick bores, valves, fire hydrants, flush valves, and other appurtenances for a water system piping project. Owner's Budget: $11,530,000.00, Anticipated Days for Completion: 480 Days Doc Note: The Issuing Office for the Bidding Documents is: JACOB & MARTIN, LLC, 3465 Curry Lane, Abilene, Texas 79606. Phone number: 325-695-1070. Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Thursday between the hours of 7:30 AM and 5:30 PM, and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office Domestic Preference This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States. The following waivers apply to this Contract: BABAA De Minimis, Small Grants, and Minor Components
Bid Results
Water / Sewer
$10,779,593.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 24, 2025
November 24, 2025
Multiple Locations, Fort Stockton, TX
Related To This Project
Fort Stockton, TX
Bid Date: Sep 19 2025
Fort Stockton, TX
Bid Date: Oct 14 2025
Fort Stockton, TX
Bid Date: Nov 19 2025
Fort Stockton, TX
Bid Date: Dec 18 2025
Fort Stockton, TX
Bid Date: Feb 05 2026
Fort Stockton, TX
--
Fort Stockton, TX
Bid Date: Sep 24 2025
Fort Stockton, TX
Bid Date: Sep 24 2025
Fort Stockton, TX
Bid Date: Aug 26 2025
Fort Stockton, TX
Bid Date: Sep 09 2025
Fort Stockton, TX
Bid Date: Sep 09 2025
Fort Stockton, TX
Bid Date: Aug 22 2025
Fort Stockton, TX
Bid Date: Jul 30 2025
Fort Stockton, TX
Bid Date: Jul 08 2025
Fort Stockton, TX
Bid Date: Jun 24 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.