Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Renovation of an educational facility in Marathon, Texas. Completed plans call for the renovation of a educational facility.

For the Gym HVAC project The successful proposer(s) will be required to enter into a general contract with Marathon Independent School District. Question Deadline 09/15/2025 All questions requiring clarification or interpretation of the Contract Documents shall make a written request which shall reach the Architect at least three days prior to the date for receipt of Proposal.

Post-Bid

Educational

$400,000.00

Public - City

Renovation

14

19

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
3
Bidding Soon
33
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

October 20, 2025

Project location map

To Be Determined, Marathon, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed