Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 2, 2025 at 8:00 PM
Updated September 3, 2025
Site work for a civil project in Marietta, Georgia. Completed plans call for site work for a water / sewer project.
Cobb County Water System is issuing this Solicitation for Request for Qualifications for Prequalification of New Contractors for Water and Sewer Line Construction, Manhole & Valve Box Adjustments, Cured-in-Place (CIPP) Rehabiliation, Manhole Rehabilitation, and Stormwater Construction. Question Submission Deadline: May 24, 2028, 5:00pm Bids are accepted by the Cobb County Water System (CCWS) for most water and sewer line installation projects only from contractors who have been prequalified for such work by the CCWS. The Cobb County Policy for Pre-qualification of Contractors requires development of the Contractor Prequalification Lists for all County agencies every two years. Contractors who wish to be considered for inclusion on the CCWS List of Prequalified Contractors must complete and submit an Application for Prequalification of Contractors (First-Time Applicants). This application process must be followed even if the firm has been previously prequalified by the CCWS for a specific project, such as a pump station or treatment plant project. Any firm that does not respond to the advertised "Request for Applications for Prequalification of Contractors" for evaluation or submits an application after the advertised deadline will not be considered for inclusion in the new List during the biennial evaluation process. Such firms will be required to conform to the prequalification application procedures for first-time applicants for consideration during a subsequent quarterly review period. The following instructions must be used when completing the Cobb County Water System (CCWS) Application for Prequalification of Contractors (First-Time Applicants). The information requested must be furnished to CCWS in order for your firm to be considered for inclusion on the List. All information submitted for the prequalification process shall become the property of the Cobb County Water System. To the extent allowed by law, financial information will be considered confidential by the Cobb County Water System. The CCWS reserves the right, but does not have the obligation, to request the submittal of additional information. If you do not currently have an established Vendor number with Cobb County, you must go to the Procurement Services Website and follow the directions for Vendor Registration. The Applicant is advised that applications are reviewed by the CCWS upon receipt; however, additions to the List of Prequalified Contractors are made by the Cobb County Board of Commissioners only on a quarterly basis. When prequalification is required, contractors must be prequalified before the first advertisement of a particular project to be eligible to submit a bid on that project.
GC Bidding
Water / Sewer
$2,000,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 31, 2028
July 31, 2028
To Be Determined, Marietta, GA
Related To This Project
Marietta, GA
Bid Date: Sep 11 2025
Marietta, GA
Bid Date: Oct 23 2025
Marietta, GA
Bid Date: Sep 11 2025
Marietta, GA
--
Marietta, GA
Bid Date: Sep 24 2025
Marietta, GA
--
Marietta, GA
Bid Date: Sep 19 2025
Marietta, GA
Bid Date: Oct 09 2025
Marietta, GA
Bid Date: Sep 19 2025
Marietta, GA
Bid Date: Sep 19 2025
Marietta, GA
--
Marietta, GA
--
Marietta, GA
Bid Date: Aug 22 2025
Marietta, GA
Bid Date: Aug 22 2025
Marietta, GA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
