Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 23, 2025 at 8:00 PM
Updated September 24, 2025
Renovation of a military facility in Fort Leavenworth, Kansas. Working plans call for the renovation of a military facility.
"As per the Owner the Project has been cancelled. Editorial Content Team is actively seeking updated information" Cancellation Description BID OPENING CANCELLATION!! This Solicitattion has been cancelled due to inadvertelly open one of the "Sealed Bid" proposal during a different bid opening while other interested vendors were present. The package was mixed up with another Invitation for Bid project, with a bid opening of 22 September 2025 at 2:00 P.M. CST. This project will be solicited utilizing a differen method at a future time. Thank you for your understanding. Felipe Zaragoza Contracting Officer. Question Deadline 09/16/2025 at 2:00 PM CT All questions concerning the ifb shall be submitted to the attention of Mr. Felipe D. Zaragoza and Ms. Jenn walker via e-mail at usarmy. leavenworth.acc-micc.mbx.construction@army.mil The scope of work involves the design, construction, renovation, and furnishing of multiple conference break areas across various military facilities. The contractor is responsible for providing all labor, materials, equipment, and supervision necessary to complete the projects in accordance with government specifications and drawings. Tasks include demolition of existing finishes and partitions, installation of new cabinetry, countertops, sinks, plumbing fixtures, electrical outlets, lighting, flooring, wall treatments, and integration of appliances such as refrigerators, microwaves, and coffee makers. Additional responsibilities include procurement and installation of furniture and accessories to support informal gatherings and collaborative environments. All work must comply with applicable building codes, safety regulations, ADA accessibility standards, and quality control requirements. Coordination with facility representatives is essential to minimize disruption to ongoing operations, and contractors must manage scheduling, site cleanliness, and waste disposal. Final acceptance will be based on inspection and compliance with contract requirements. THE MAGNITUDE OF CONSTRUCTION IS PROVIDED IAW FAR 36.204 (E) $500,000.00 TO $1,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$1,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2025
March 23, 2026
410 Kearny Ave, Fort Leavenworth, KS
Related To This Project
Fort Leavenworth, KS
Bid Date: Sep 12 2025
Fort Leavenworth, KS
Bid Date: Oct 24 2025
Fort Leavenworth, KS
Bid Date: Nov 20 2025
Fort Leavenworth, KS
Bid Date: Nov 20 2025
Fort Leavenworth, KS
Bid Date: Nov 12 2025
Fort Leavenworth, KS
--
Fort Leavenworth, KS
Bid Date: Feb 04 2026
Fort Leavenworth, KS
Bid Date: Sep 25 2025
Fort Leavenworth, KS
Bid Date: Sep 16 2025
Fort Leavenworth, KS
Bid Date: Sep 17 2025
Fort Leavenworth, KS
Bid Date: Sep 26 2025
Fort Leavenworth, KS
Bid Date: Sep 22 2025
Fort Leavenworth, KS
Bid Date: Sep 18 2025
Fort Leavenworth, KS
--
Fort Leavenworth, KS
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
