Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 23, 2025 at 8:00 PM
Updated October 24, 2025
Site work and paving for a mixed-use development in Sutherlin, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The work proposed generally consists of furnishing all labor, equipment, materials and supervision for 350 square yards of cold plane pavement removal, the removal and replacement of 60 feet of standard curb, the removal and replacement of 75 feet of 12 storm pipe, installation of 2 catch basins, earthwork, widening and reconstruction of the roads to include installation of approximately 1,350 square yards of subgrade geotextile, 950 tons of base rock, 800 tons of asphalt, and other work as required by the plans and specifications . Technical Questions to: Cole Riley, EIT. i.e. Engineering, Inc. 809 SE Pine St. Roseburg, OR 97470 541.673.0166 riley@ieengineering.com The Contractor shall complete all Work to be done under the Contract before the elapse of 45 Calendar Days after beginning work, or not later than December 15th, 2025 whichever occurs first. Estimate range for the project of $275,000 to $345,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$319,514.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2025
October 20, 2025
Multiple Locations, Sutherlin, OR
Related To This Project
Sutherlin, OR
Bid Date: Dec 22 2025
Sutherlin, OR
--
Sutherlin, OR
--
Sutherlin, OR
Bid Date: Jul 18 2024
Sutherlin, OR
Bid Date: Jun 06 2024
Sutherlin, OR
Bid Date: Feb 14 2024
Sutherlin, OR
Bid Date: Apr 06 2022
Sutherlin, OR
Bid Date: May 02 2022
Sutherlin, OR
Bid Date: Jan 21 2022
Sutherlin, OR
Bid Date: May 22 2024
Sutherlin, OR
Bid Date: Jul 20 2023
Sutherlin, OR
Bid Date: May 23 2023
Sutherlin, OR
Bid Date: Apr 26 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
