Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 1, 2026 at 8:00 PM
Updated May 20, 2026
Demolition, site work, paving and new construction of a civil project in Bruce Crossing, Michigan. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As per the Owner all bids have been rejected. Bridge reconstruction including replacement with 45-inch prestressed concrete I-beams, steel piling, drainage, concrete curb and gutter, sewer, guardrail and approach work on Bond Falls Road over the middle branch of the Ontonagon River, Ontonagon County. This is a Local Agency project. 0% Sbp Participation Required Net classification required for this project is 1778 Fa All inquiries concerning the plans and proposal for this project are to be directed to: Tim Barry Local Agency Program Bridge Area Engineer MDOT-eProposal@Michigan.gov To be able to process and distribute an addendum, if required, all inquiries shall be made at least seven (7) calendar days before the letting. MIDOT - 2604 018 - Bridge Reconstruction Including Replacement With 45-inch Prestressed Concrete I-beams, Steel Piling, Concrete Curb and Gutter, Sewer, Guardrail and Approach Work on Bond Falls Road
Final Planning
Bridges / Tunnels
$2,474,799.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2026
October 30, 2026
Bond Falls Rd, Bruce Crossing, MI
Related To This Project
Bruce Crossing, MI
Bid Date: May 22 2024
Bruce Crossing, MI
--
Bruce Crossing, MI
--
Bruce Crossing, MI
Bid Date: May 22 2023
Salem Township, MI
Bid Date: Mar 17 2026
Laird Township, MI
Bid Date: Apr 03 2026
Green Oak Township, MI
Bid Date: Apr 03 2026
Plainfield charter Township, MI
Bid Date: Apr 03 2026
Flint, MI
Bid Date: Mar 09 2026
Cheboygan, MI
Bid Date: Apr 03 2026
Houghton, MI
Bid Date: Apr 03 2026
Allegan, MI
Bid Date: Apr 03 2026
Rockford, MI
Bid Date: Mar 24 2026
Sterling Heights, MI
Bid Date: Mar 26 2026
Holland, MI
Bid Date: Apr 01 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
