Site work for a road / highway in Stanton, California. Completed plans call for site work for a road / highway.

Furnishing to City of all labor, equipment, materials, tools, services, transportation, and all other items necessary for the Citywide Street Sign Replacement Project (Phase 2) (the "Project"). This Project comprises of the furnishing of all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications, and Contract Documents. The general items of work to be performed hereunder consist of but not be limited to Mobilization; Preparation and Implementation of Best Management Practices; Confirming Traffic Control using CA MUTCD latest edition, Construction Phase Plan/Schedule; Obtaining Encroachment Permitting and meeting all necessary conditions of approval from the City or all surrounding City/Agency as applicable; Installing the New Street Name Signs; Installing sign posts; removal of existing signs and infrastructure; and performing all associated work to complete this Project in its entirety. Bids must be submitted on the City's Bid Forms as hardcopies. Contractors need not purchase a hard copy set of plans from the City. To the extent required by section 20103.7 of the Public Contract Code, upon request from a contractor plan room service, the City shall provide an electronic copy of the Contract at no charge to the contractor plan room. Bidders who do not have access to the platforms listed, can request a hard copy of Bid Forms and Contract Documents by notifying the City via email at publicworks@stantonca.gov two (2) days in advance. A non-refundable charge of Ten Dollars ($10.00) will be required of any bidder who requests that the Contract Documents be mailed within California (costs for out-of-state mailings will be higher). Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of Stanton as Bid Guarantee. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful Bidder may substitute certain securities for funds withheld by City to ensure its performance under the Contract. Pursuant to Labor Code Section 1773, City has obtained the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in Orange County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute this contract. A copy of these prevailing wage rates may be obtained via the internet at online In addition, a copy of the prevailing rate of per diem wages is available at City Clerk and shall be made available to interested parties upon request. The successful Bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory upon the Bidder to whom the Contract is awarded, and upon any subcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the said specified prevailing wage rates to all workers employed by them in the execution of the Contract, employment of apprentices, hours of labor and debarment of contractors and subcontractors. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No Bid will be accepted nor any Contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on this Project, it shall be the Bidder's sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law in its Bid. Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the following classification(s) throughout the time it submits its Bid and for the duration of the Contract: Class A, or Class B. City shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by City from the Total Base Bid. City reserves the right to reject any or all Bids or to waive any irregularities or informalities in any Bids or in the bidding process. For further information, please contact the Daniel Herrera, Public Works/Engineering, at dherrera@stantonca.gov (e-mail) or 714-890-4250. Question Deadline 09/16/2025 at 2:00 PM PT Questions regarding the Contract Documents, requests for interpretations or clarifications, either administrative or technical, may be directed to the Public Works/Engineering, Daniel Herrera, by email at dherrera@StantonCA.gov

Award

Roads / Highways

$173,910.00

Public - City

Site Work

3

6

6

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
665
Active Projects
298
Bidding Soon
3,695
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.