BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2026 at 7:00 PM

Updated January 30, 2026

Demolition, site work, paving and new construction of a mixed-use development in Corunna, Michigan. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and road / highway.

Bridge reconstruction including removal and replacement, concrete curb and gutter, guardrail, signing and pavement markings on Hibbard Road over Burgess Drain, Shiawassee County. This is a Local Agency project. 4% Sbp Participation Required Net classification required for this project is 998 Ea or 998 Fa In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ea and Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 2602 022 - Bridge Reconstruction Including Removal and Replacement, Concrete Curb and Gutter, Guardrail, Signing and Pavement Markings on Hibbard Road

GC Bidding

Bridges / Tunnels

$998,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

50

7

2

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
249
Bidding Soon
2,336
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

March 9, 2026

Project location map

Hibbard Rd, Corunna, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.