Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 25, 2025 at 8:00 PM
Updated September 26, 2025
Site work and paving for a road / highway in Hokes Bluff, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Resurfacing and Traffic Stripe of Reeves Road and Jenkins Road in-cluding 2,560 tons wearing surface, 209 tons patching, 542 tons leveling, 75 tons aggregate surfacing, 720 CY topsoil (loose truckbed measurement), 2 acres seeding, 2 acres mulching, 3 miles solid white class 2, type A traffic stripe, 5 miles solid yellow, class 2, type A traffic stripe, 144 SF traffic control markings, class 2 type A, 290 each pavement markers and related items. Unsuccessful bidders will be refunded 100% of the plan deposit for one set returned to the Engineer, in reusable condition, within 10 days after the bid opening. Additional sets obtained shall be refunded 50% of the plan deposit. Unsuccessful bidders will be refunded 100% of the plan deposit for one set returned to the Engineer, in reusable condition, within 10 days after the bid opening. Additional sets obtained shall be refunded 50% of the plan deposit. All non-bidders, subcontractors, vendors or dealers shall be refunded 50% of the plan deposit for each set returned to the Engineer, in reusable condition, within 10 days after the bid opening. The plan deposit amount as indicated above is in accordance with Alabama Act No. 97-225 relating to the competitive bid laws for public works. All Bidders must comply with the requirements of the State Licensing Board for General Contractors (Latest Edition) and with the Alabama Act No. 97-225 (Title 39, Code of Alabama, 1975 as amended) relating to competitive bid laws for public works. All Bidders must be properly licensed in accordance with the requirements of the State Licensing Board for General Contractors (Chapter 8, Title 34, Code of Alabama, 1975 or latest). All observation, interpretation of Drawings, approval of items and materials, and approval of change orders shall be handled by the Owner's Engineer: Ladd Environmental Consultants, Inc. (P.O. Box 680869, Zip Code 35968-1609) 1207 Chitwood Avenue, S.E. Fort Payne, Alabama 35967-4822 Phone: 256-845-5315 FAX: 256-845-5383 E-MAIL: ladd@laddenv.com
Bid Results
Roads / Highways
$446,154.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
October 22, 2025
Multiple Locations, Hokes Bluff, AL
Related To This Project
Hokes Bluff, AL
Bid Date: Apr 21 2025
Hokes Bluff, AL
Bid Date: Sep 10 2024
Hokes Bluff, AL
Bid Date: Mar 19 2024
Hokes Bluff, AL
Bid Date: May 18 2022
Hokes Bluff, AL
Bid Date: Nov 04 2022
Hamilton, AL
Bid Date: Sep 02 2025
Montgomery, AL
Bid Date: Oct 28 2025
Jackson, AL
Bid Date: Dec 18 2025
Huntsville, AL
Bid Date: Sep 02 2025
New Site, AL
Bid Date: Sep 29 2025
Huntsville, AL
--
Auburn, AL
Bid Date: Sep 25 2025
Newton, AL
Bid Date: Oct 02 2025
Birmingham, AL
Bid Date: Sep 23 2025
Birmingham, AL
Bid Date: Sep 04 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
